Difference between revisions of "Aug 18, 2021 - Group Meeting"

From Ciswikidb
Jump to navigation Jump to search
 
(One intermediate revision by the same user not shown)
Line 4: Line 4:
  
 
;General Info
 
;General Info
* JSA Initiatives program deadline Aug 27 - http://www.jsallc.org/CP22.html
+
* JSA Initiatives program deadline Aug 27 - http://www.jsallc.org/CP22.html - We will have two, from Carlos (US/Mexico) and Joe (JPos 2022)
 
* SPIN 2021 abstract deadline Aug 31 - https://indico2.riken.jp/event/3082/
 
* SPIN 2021 abstract deadline Aug 31 - https://indico2.riken.jp/event/3082/
* Free lunch at the cafeteria this week!
+
* Free lunch at the cafeteria this week! - $12 towards a meal, just show up, you're on a list already
  
 
;CEBAF
 
;CEBAF
Line 26: Line 26:
  
 
;R&D projects
 
;R&D projects
 +
* I&C UHV upgrade
 
* High voltage
 
* High voltage
 
* Positrons
 
* Positrons

Latest revision as of 09:05, 18 August 2021

Meeting Info
General Info
CEBAF
  • Marcy - On-call report
  • Diamond Mott measurements
  • Danny confirms the Mott 3D line is 12 deg on design, not 12.5 deg - the value we've used for many years
  • The next SAD .... dun dun dun dun - https://wiki.jlab.org/ciswiki/index.php/Phase_2
UITF
  • Max - Status at UITF
  • Table of settings 200 kV vs. 180 kV
  • Progress on the 3rd Wien
EIC
  • Monthly joint meeting with BNL source group
  • Harmonic kicker - beam line concept, low rep rate beam
  • 400 MeV linac procurement scope
  • RCS dipoles
R&D projects
  • I&C UHV upgrade
  • High voltage
  • Positrons
  • Status at GTS
Conferences & Workshops
Paper writing updates...
  • Riad, Vasily, Slava - Spin transparent rings for EDM, BSM physics (submitted PRL 7/20)
  • Shukui - Green fiber laser
  • Josh, Joe- Biased anode study
  • Sajini, Riad - GTS magnetized beam paper
  • Sajini, Carlos - GTS gun re-design paper