Difference between revisions of "August 10, 2015 - CEBAF/LERF"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "There are a diverse set of tasks and beam related tests we're aiming to do at both the CEBAF and LERF injectors over the next 3 months. I reserved TL-1227 next Monday August ...")
 
Line 2: Line 2:
  
 
1. Joe/John - Status of CEBAF 4-laser upgrade, commissioning plans and Fall program
 
1. Joe/John - Status of CEBAF 4-laser upgrade, commissioning plans and Fall program
 +
 
2. Bubba/Carlos/Shukui - Plans for recovering gun/photocathode + laser @ LERF
 
2. Bubba/Carlos/Shukui - Plans for recovering gun/photocathode + laser @ LERF
 +
 
3. Riad - Requirements and plans for Bubble commissioning run @ CEBAF
 
3. Riad - Requirements and plans for Bubble commissioning run @ CEBAF
 +
 
4. George/Pavel - Status, requirements, plans for gallium radio-isotope test @ CEBAF
 
4. George/Pavel - Status, requirements, plans for gallium radio-isotope test @ CEBAF
 +
 
5. Alicia/Reza/Yan - Injector group beam study plans
 
5. Alicia/Reza/Yan - Injector group beam study plans
 +
 
6. Marcy/Shukui/Joe - Characterization tests of GaAs/GaAsP, DBR, Sb-cathode
 
6. Marcy/Shukui/Joe - Characterization tests of GaAs/GaAsP, DBR, Sb-cathode
 +
 
7. Fay/Mahmoud/Matt/Joe - Brock cavity measurements (bunch length, phase monitoring, ?)
 
7. Fay/Mahmoud/Matt/Joe - Brock cavity measurements (bunch length, phase monitoring, ?)
 +
 
8. What/who else am I forgetting?
 
8. What/who else am I forgetting?

Revision as of 13:18, 3 August 2015

There are a diverse set of tasks and beam related tests we're aiming to do at both the CEBAF and LERF injectors over the next 3 months. I reserved TL-1227 next Monday August 10 @ 1:30pm to share and discuss these. How about we go around the room hearing a ~brief update/plan on the topics listed below. Please come prepared with or upload to wiki link below any information that helps convey details, plans, beam requirements, time, etc. etc.

1. Joe/John - Status of CEBAF 4-laser upgrade, commissioning plans and Fall program

2. Bubba/Carlos/Shukui - Plans for recovering gun/photocathode + laser @ LERF

3. Riad - Requirements and plans for Bubble commissioning run @ CEBAF

4. George/Pavel - Status, requirements, plans for gallium radio-isotope test @ CEBAF

5. Alicia/Reza/Yan - Injector group beam study plans

6. Marcy/Shukui/Joe - Characterization tests of GaAs/GaAsP, DBR, Sb-cathode

7. Fay/Mahmoud/Matt/Joe - Brock cavity measurements (bunch length, phase monitoring, ?)

8. What/who else am I forgetting?