Difference between revisions of "August 31, 2020 - AIPINJ Phase 1 Planning Meeting"

From Ciswikidb
Jump to navigation Jump to search
 
Line 6: Line 6:
  
 
::(20 min) Overview of beam line [[media:200821_Songsheet.pdf]]
 
::(20 min) Overview of beam line [[media:200821_Songsheet.pdf]]
::(20 min) Status of elements [[200827_AIPINJ_layout_rev5.xlsx]]
+
::(20 min) Status of elements [[media:200827_AIPINJ_layout_rev5.xlsx]]
 
::(20 min) Discussion of draft schedule [[media:200826_AIPINJ_Schedule.xlsx]]
 
::(20 min) Discussion of draft schedule [[media:200826_AIPINJ_Schedule.xlsx]]

Latest revision as of 12:15, 27 August 2020

Phase 1 of the injector upgrade begins in a little more than 3 weeks. The layout is final, the design work is ramping down. Daily jobs involve fabrication, assembly and testing. Integration with out groups and the SAD calendar is ramping up.

We'll do the following...

(20 min) Overview of beam line media:200821_Songsheet.pdf
(20 min) Status of elements media:200827_AIPINJ_layout_rev5.xlsx
(20 min) Discussion of draft schedule media:200826_AIPINJ_Schedule.xlsx