(Created page with "Phase 1 of the injector upgrade begins in a little more than 3 weeks. The layout is final, the design work is ramping down. Daily jobs involve fabrication, assembly and tes...")
 
Line 5: Line 5:
 
We'll do the following...
 
We'll do the following...
  
::(30 min) Overview and status of the new beam line [[media:200821_Songsheet.pdf]]
+
::(20 min) Overview of beam line [[media:200821_Songsheet.pdf]]
::(30 min) Discussion of draft schedule [[media:200826_AIPINJ_Schedule.xlsx]]
+
::(20 min) Status of elements [[200827_AIPINJ_layout_rev5.xlsx]]
 +
::(20 min) Discussion of draft schedule [[media:200826_AIPINJ_Schedule.xlsx]]

Revision as of 12:14, 27 August 2020

Phase 1 of the injector upgrade begins in a little more than 3 weeks. The layout is final, the design work is ramping down. Daily jobs involve fabrication, assembly and testing. Integration with out groups and the SAD calendar is ramping up.

We'll do the following...

(20 min) Overview of beam line media:200821_Songsheet.pdf
(20 min) Status of elements 200827_AIPINJ_layout_rev5.xlsx
(20 min) Discussion of draft schedule media:200826_AIPINJ_Schedule.xlsx