Phase 1 of the injector upgrade begins in a little more than 3 weeks. The layout is final, the design work is ramping down. Daily jobs involve fabrication, assembly and testing. Integration with out groups and the SAD calendar is ramping up.

We'll do the following...

(30 min) Overview and status of the new beam line media:200821_Songsheet.pdf
(30 min) Discussion of draft schedule media:200826_AIPINJ_Schedule.xlsx