August 31, 2020 - AIPINJ Phase 1 Planning Meeting

From Ciswikidb
Revision as of 12:14, 27 August 2020 by Grames (talk | contribs)
Jump to navigation Jump to search

Phase 1 of the injector upgrade begins in a little more than 3 weeks. The layout is final, the design work is ramping down. Daily jobs involve fabrication, assembly and testing. Integration with out groups and the SAD calendar is ramping up.

We'll do the following...

(20 min) Overview of beam line media:200821_Songsheet.pdf
(20 min) Status of elements 200827_AIPINJ_layout_rev5.xlsx
(20 min) Discussion of draft schedule media:200826_AIPINJ_Schedule.xlsx