Difference between revisions of "Beamline viewers"

From Ciswikidb
Jump to navigation Jump to search
 
(No difference)

Latest revision as of 14:35, 23 June 2021

Phase 1 included upgrading 8 viewer assemblies.

Visualizing the viewers
Installation by viewer
  • ITV2I01 @ Y-chamber (chromox w/ 10 mm hole), w/ top-hat, retracts into tack welded tube, standard rod, new bellows
  • ITV1I02 @ Laser-chamber (chromox no hole), w/ top-hat, retracts into tack welded tube, standard rod, new bellows
  • ITV1I03 @ V-Wien entrance (chromox no hole), w/ top-hat - requires long extension rod, new bellows
  • ITV1I04 @ V-Wien exit (chromox no hole), w/ top-hat - requires long extension rod, new bellows
  • ITV1I05 @ H-Wien entrance (chromox no hole), w/ top-hat - requires long extension rod, new bellows
  • ITV1I06 @ H-Wien exit (chromox no hole), w/ top-hat - requires long extension rod, new bellows
  • ITV0I01 @ Pcup (chromox no hole), w/top-hat - standard rod, new bellows
  • ITV0I02 @ Harp (YAG w/ 5m and 10mm square marking), removing top-hat interference w/ harp - standard rod, new bellows
Engineering