Difference between revisions of "Beamline viewers"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "The viewers on each girder go like this: ;By girder :Y-chamber : two :Wien girder : four :A1/A2 girder : two ;By screen : Laser => chromox w/ 10mm hole : At harp => YAG : Al...")
 
 
(4 intermediate revisions by 2 users not shown)
Line 1: Line 1:
The viewers on each girder go like this:
+
Phase 1 included upgrading 8 viewer assemblies.
  
;By girder
+
;Visualizing the viewers
:Y-chamber : two
+
* List of viewers by installation section [[media:210616_Injector Phase I Viewer List.xlsx]]
:Wien girder : four
+
* 3d visualization of viewers from beam's and camera's points of view (ME camera views are upgright - so rotate camera or ME view) [[media:210616_PHASE 1 VIEWERS.pptx]]
:A1/A2 girder : two
 
  
;By screen
+
; Installation by viewer
: Laser => chromox w/ 10mm hole
+
* ITV2I01 @ Y-chamber (chromox w/ 10 mm hole), w/ top-hat, retracts into tack welded tube, standard rod, new bellows
: At harp => YAG
+
* ITV1I02 @ Laser-chamber (chromox no hole), w/ top-hat, retracts into tack welded tube, standard rod, new bellows
: All others => chromox no hole
+
* ITV1I03 @ V-Wien entrance (chromox no hole), w/ top-hat - requires long extension rod, new bellows
 +
* ITV1I04 @ V-Wien exit (chromox no hole), w/ top-hat - requires long extension rod, new bellows
 +
* ITV1I05 @ H-Wien entrance (chromox no hole), w/ top-hat - requires long extension rod, new bellows
 +
* ITV1I06 @ H-Wien exit (chromox no hole), w/ top-hat - requires long extension rod, new bellows
 +
* ITV0I01 @ Pcup (chromox no hole), w/top-hat - standard rod, new bellows
 +
* ITV0I02 @ Harp (YAG w/ 5m and 10mm square marking), removing top-hat interference w/ harp - standard rod, new bellows
  
;By screen assembly
+
; Engineering
: All have a shield at base of screen
+
* New air cylinder modifications [[media:210115_ViewerOptions.docx]]
: Laser and Y retract into tack welded tube
+
* New viewer drawings https://wiki.jlab.org/ciswiki/index.php/Viewers
 
 
;Viewer assembly info
 
: all bellows replaced
 
: status Jan 15, 2021
 
::: Y/Laser installed in tunnel
 
::: Remaining (4) Wien + (2) A1/A2 required new air cylinders [[media:210115_ViewerOptions.docx]]
 

Latest revision as of 14:35, 23 June 2021

Phase 1 included upgrading 8 viewer assemblies.

Visualizing the viewers
Installation by viewer
  • ITV2I01 @ Y-chamber (chromox w/ 10 mm hole), w/ top-hat, retracts into tack welded tube, standard rod, new bellows
  • ITV1I02 @ Laser-chamber (chromox no hole), w/ top-hat, retracts into tack welded tube, standard rod, new bellows
  • ITV1I03 @ V-Wien entrance (chromox no hole), w/ top-hat - requires long extension rod, new bellows
  • ITV1I04 @ V-Wien exit (chromox no hole), w/ top-hat - requires long extension rod, new bellows
  • ITV1I05 @ H-Wien entrance (chromox no hole), w/ top-hat - requires long extension rod, new bellows
  • ITV1I06 @ H-Wien exit (chromox no hole), w/ top-hat - requires long extension rod, new bellows
  • ITV0I01 @ Pcup (chromox no hole), w/top-hat - standard rod, new bellows
  • ITV0I02 @ Harp (YAG w/ 5m and 10mm square marking), removing top-hat interference w/ harp - standard rod, new bellows
Engineering