Things To Do Before Making Bubbles

No Beam Checklist

  • Survey and align 5D line

Beam Checklist

  • Calibrate 0L02 BCM
  • Quad-center 0L02, 0L02A, 5D00, 5D01 and set BPM GOFs accordingly
  • Measure beam position directly after radiator

Bubble Chamber Checklist

  • Fill chamber with C2F6

Bubble Chamber Tests