Difference between revisions of "Bubble Chamber Meeting Friday November 30, 2018"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "e will meet in TL 2221 on Friday November 9 at 10:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Pho...")
 
Line 1: Line 1:
e will meet in TL 2221 on Friday November 9 at 10:00 am EST.
+
e will meet in TL 2221 on Friday November 30 at 10:00 am EST.
  
 
== For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. ==
 
== For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. ==
Line 11: Line 11:
  
 
* Data Analysis:
 
* Data Analysis:
** David: [[media:DNetoBubbleUpdate-110918.pdf]]
+
** David
** Seamus  [https://anl.box.com/shared/static/vbet307sx6kshfe6j6m643dwppt3d7kv.pdf pdf]
 
  
  
* Schedule: Accelerator delays in August and September 2018 may affect the planned Spring 2019 engineering run.
+
* Accelerator Schedule:  
 +
# Spring Engineering Run:
 +
** Install" 4/9 - 4-15
 +
** Beam (swing/owl, weekends): 4/15 - 4/29
 +
# Fall Engineering Run: not likely
  
  
 
* Paper draft
 
* Paper draft

Revision as of 14:10, 29 November 2018

e will meet in TL 2221 on Friday November 30 at 10:00 am EST.

For those calling in we'll use the Blue Jeans [1] audio conference system.

Phone number: 1-888-240-2560
Meeting ID: 3528502673#
Moderator Passcode: 5978#
Meeting URL: http://bluejeans.com/3528502673


Agenda

  • Data Analysis:
    • David


  • Accelerator Schedule:
  1. Spring Engineering Run:
    • Install" 4/9 - 4-15
    • Beam (swing/owl, weekends): 4/15 - 4/29
  1. Fall Engineering Run: not likely


  • Paper draft