Difference between revisions of "Bubble Chamber Meeting Thursday March 22, 2018"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "We will meet in TL 2236 on Thursday March 22 at 4:00 pm EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Pho...")
 
 
(9 intermediate revisions by the same user not shown)
Line 4: Line 4:
 
  Phone number: 1-888-240-2560
 
  Phone number: 1-888-240-2560
 
  Meeting ID: 3528502673#
 
  Meeting ID: 3528502673#
Moderator Passcode: 5978#
 
 
  Meeting URL: http://bluejeans.com/3528502673
 
  Meeting URL: http://bluejeans.com/3528502673
  
Line 10: Line 9:
 
===Agenda===
 
===Agenda===
  
* Bubble Chamber will arrived at JLab March 9th.
+
* Bubble Chamber arrived at JLab March 9th
  
  
* Whitney Armstrong - Geant4 Simulation
+
* Seamus Riordan - <sup>19</sup>F(γ,α)<sup>15</sup>N Energy Width Systematic Studies: [[media:riordan_systematics_22mar2018.pdf]]
 
 
 
 
* Seamus Riordan - <sup>19</sup>F(γ,α)<sup>15</sup>N Systematic Studies: [[media:riordan_systematics_mar2018.pdf]]
 
 
 
 
 
* [[Accelerator Test Review]]
 
  
  
Line 28: Line 21:
  
 
* '''Questions:'''
 
* '''Questions:'''
# Can we run the chamber from MCC instead of Injector Service Building? ''Yes, Brad is buying a new KVM Desktop Extender [http://www.gefen.com/product/dvi-kvm-over-ip-w-local-dvi-output-receiver-unit-package-EXT-DVIKVM-LAN-LRX]''
+
:: Does the Bubble Chamber equipment remain in the machine upon completion of the run this summer?  
# Is it possible to save a unique identification tag of each bubble event in EPICS Archiver? ''Yes, How-To was sent to ANL''
+
:: If yes, what special considerations will need to be taken to moth-ball the experiment?
  
  
 
=== Accelerator Schedule===
 
=== Accelerator Schedule===
  
* Dates leading to '''''Bubble Engineering Run I:'''''
+
* Physics run extended to April 16
 
 
  Now          - Mon 3/26 8am : CEBAF is down
 
  Mon 3/26 8am - Wed 4/18 8am : CEBAF Spring Run
 
  Wed 4/18 8am - Wed 5/02 8am : Injector OPEN except weekdays LOCKED after 3pm for safety certification
 
  Wed 5/02 8am - wed 5/16 8am : Injector LOCKED weekdays typically 8am-8pm for User Beam Studies
 
  Wed 5/16 8am - Wed 5/30 8am : Injector and North linac LOCKED 24/7 for Bubble Engineering Run
 
  Wed 5/30 8am - ...          : Injector OPEN for Gun Upgrade
 
 
 
  Support needed:  installation, alignment, source, networking, computing
 
 
 
  
* '''''Bubble Run II:''''' August 6 - August 19, 2018
+
* Summer activities are shifted and condensed [[media:180320_SAD-2018.xlsx]]

Latest revision as of 08:38, 23 March 2018

We will meet in TL 2236 on Thursday March 22 at 4:00 pm EST.

For those calling in we'll use the Blue Jeans [1] audio conference system.

Phone number: 1-888-240-2560
Meeting ID: 3528502673#
Meeting URL: http://bluejeans.com/3528502673


Agenda

  • Bubble Chamber arrived at JLab March 9th



  • Bubble Chamber Beam Requirements:
Parameters Table: media:Bubble_BeamParameters_table.pdf
Sensitivity Study: media:BeamParameters_sensitivity_study_Feb2018.pdf


  • Questions:
Does the Bubble Chamber equipment remain in the machine upon completion of the run this summer?
If yes, what special considerations will need to be taken to moth-ball the experiment?


Accelerator Schedule

  • Physics run extended to April 16