Difference between revisions of "Bubble Chamber Meeting Wednesday May 4, 2016"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "We will meet in TL 2221 on Wednesday May 4 at 3:30 pm EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone...")
 
Line 10: Line 10:
 
'''Agenda:'''
 
'''Agenda:'''
  
1- New Test Run II Schedule  
+
1- Test Run II Schedule  
# Bubble Installation: August 15 – Augusts 18, 2016: Day shift only
+
# Bubble Installation: August 15 – August 18, 2016: Day shift only
 
# Bubble Run: Aug 19 – Sept 2, 2016
 
# Bubble Run: Aug 19 – Sept 2, 2016
  
Line 20: Line 20:
 
4- Beam Analysis: energy and position – energy spread and beam size
 
4- Beam Analysis: energy and position – energy spread and beam size
  
5- Measuring <sup>19</sup>F(γ,α)<sup>15</sup>N in June 2016
+
5- Measuring <sup>19</sup>F(γ,α)<sup>15</sup>N
  
 
6- New beamline design with sweep magnet
 
6- New beamline design with sweep magnet

Revision as of 16:33, 6 April 2016

We will meet in TL 2221 on Wednesday May 4 at 3:30 pm EST.

For those calling in we'll use the Blue Jeans [1] audio conference system.

Phone number: 1-888-240-2560
Meeting ID: 3528502673#
Moderator Passcode: 5978#
Meeting URL: http://bluejeans.com/3528502673


Agenda:

1- Test Run II Schedule

  1. Bubble Installation: August 15 – August 18, 2016: Day shift only
  2. Bubble Run: Aug 19 – Sept 2, 2016

2- Approved Bubble Chamber TOSP expired on Dec 8, 2015. Need to re-submit a new one for approval with addendum of changes to chamber and 100 µA beam current.

3- Bubble Chamber work at ANL

4- Beam Analysis: energy and position – energy spread and beam size

5- Measuring 19F(γ,α)15N

6- New beamline design with sweep magnet