Difference between revisions of "Bubble Chamber Meeting Wednesday October 7, 2015"

From Ciswikidb
Jump to navigation Jump to search
Line 39: Line 39:
 
### Better light coverage
 
### Better light coverage
 
### Improve cooling capacity
 
### Improve cooling capacity
### Introduce a lens to locate camera farther and better shielding of gammas (camera was sensitive to gammas)
+
### Introduce a lens to locate camera farther and for better shielding of gammas (camera was sensitive to gammas)
 
### Improve operational pressure control and regulation
 
### Improve operational pressure control and regulation
 
### Be able to take data from MCC instead of Injector Service Building
 
### Be able to take data from MCC instead of Injector Service Building

Revision as of 13:58, 9 October 2015

We will meet in TL 2221 on Wednesday October 7 at 3:30 pm EST.

For those calling in we'll use the Blue Jeans [1] audio conference system.

Phone number: 1-888-240-2560
Meeting ID: 3528502673#
Meeting URL: http://bluejeans.com/3528502673


Agenda:

1- Bubble Chamber removal and shipping back to ANL

2- September beam test summary




Notes from this meeting:


  • Bubble Chamber Removal:
  1. Planned on October 20 and 21
  2. Crates will be staged by October 19
  3. Plan to ship every thing back to Argonne
  4. Shipping arrangement will be made once chamber is crated and ready in north tunnel access building


  • Beam Test Summary (Ernst):
  1. Plus
  2. Minus
    1. Events distribution shows a cone instead of a cylinder - why?
  3. Improvements
    1. Easy
      1. Better light coverage
      2. Improve cooling capacity
      3. Introduce a lens to locate camera farther and for better shielding of gammas (camera was sensitive to gammas)
      4. Improve operational pressure control and regulation
      5. Be able to take data from MCC instead of Injector Service Building
    2. Tough
      1. One fluid system - no more mercury
      2. New collimator in chamber


  • Beam Energy: