Bubble Demo ME May 9, 2014
Jump to navigation
Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
We will meet Friday May 9 @ 9am in TL-2236.
SUMMER Installation
DL Items
- (Shaun/Joe) Finalize/sign drawings => Done?
- (Tim) Identify vendor for DL? => PR#343083 to get quotes from Alpha Magnetics, New England Technicoil, Stangnes Industries
- (Tim/Joe/Shaun ?) Identify vendor for DL alignment plate => Shaun will ask Tim to be made...
Beamline layout
- (Shaun) Send Joe copy of layout => Done
- (Joe) Help categorize component inventory => Joe sit w/ Phil make list
- re-use from tunnel, on shelf, buy part, design/fab part
- (Shaun) Bellows arrangement => Bellows added, need support at end of first bellows.
- (Shaun) Modify support of "green" girder => Done, looks good.
- (Shaun) Plan/schedule for drawings and fabrication => Couple days of effort. Riad would like layout by Wed14th.
- (Riad) Aluminum photon dump dimensions => Riad still working this prob
Beamline components
- (Joe) Are MBH corrector strengths sufficient? => 4 Haimson pairs will work
- (Joe M.) Is radiator cooling flange sufficient? => Shaun will work new concept. Joe M. will make new assessment.
Bubble Chamber Alignment
- (Riad/Brad/Shaun) Mounting in tunnel
- (Riad/Brad/Shaun) Chamber alignment capability
FINAL installation
- Identify suitable dump dipole and its dimensions