This area is related to Injector Upgrade Meetings
 
This area is related to Injector Upgrade Meetings
  
= [[Injector Upgrade Meetings]] =
+
==Injector upgrade calendar==
 +
:: Run (now - May 6)
 +
:: Phase 1 (May 6 - end of 2020)
 +
:: Run (Jan 2021 - Sep 13 2021)
 +
:: Phase 2 (Sep 13 - end of 2021)
  
== [[AIPINJ Layouts]] ==
+
=== [[Injector Upgrade Meetings]] ===
  
== [[200KV 15 deg dipole]]
+
=== [https://jeffersonlab-my.sharepoint.com/:f:/g/personal/grames_jlab_org/EhXqNtq16CBNt4JzMmy4T1ABpR9qdRQQGacUVwrDGi9DEw?e=Gb8Y85 Link to AIPINJ OneDrive folder] ===
  
== [[200kV Wien Filter]] ==
+
=== [[AIPINJ Layouts]] ===
  
== [[Injector Solenoids Upgrade]] ==
+
=== [[Injector Upgrade Documents and Links]] ===
  
== [[Vacuum Upgrades]] ==
+
== Components ==
 +
::[[200KV 15 deg dipole]]
 +
::[[200KV gun BPM's]]
 +
::[[200kV Wien Filter]]
 +
::[[Injector Solenoids Upgrade]]
 +
::[[200kV Quadrupoles]]
 +
::[[200kV PSS Kicker]]
 +
::[[200kV Prebuncher]]
 +
::[[200kV Choppers]]
 +
::[[Vacuum Upgrades]]
 +
::[[A1 Aperture Motor Control]]
  
== [[Injector Upgrade Documents and Links]] ==
+
==ATLIS Tasks==
 +
=== AIPINJ ===
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20415 Injector Camac to Vme and camera upgrade]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20395 Pedestal Location Surveys]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20404 Install Chopper SSA's]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20410 Chopper SSA LCW]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/19517 Penetration Drops]
 +
* [http://devweb.acc.jlab.org/CSUEApps/uitflist/task/1273 Testing Wien HV Controls at UITF]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/18471 Accelerator network re-survey]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20270 Remove and re-install BPM's Gun to chopper]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20275 Install new IPM2I03]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20268 Remove and calibrate current monitoring electronics]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/17932 Harp work]
 +
=== Non-AIPINJ ===
 +
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/19463 New Gun2 loading chamber]
 +
* Placeholder for Tim Minga to test laser room smoke detector alarm to MCC/Guard

Latest revision as of 12:31, 10 April 2020

This area is related to Injector Upgrade Meetings

Injector upgrade calendar

Run (now - May 6)
Phase 1 (May 6 - end of 2020)
Run (Jan 2021 - Sep 13 2021)
Phase 2 (Sep 13 - end of 2021)

Injector Upgrade Meetings

Link to AIPINJ OneDrive folder

AIPINJ Layouts

Injector Upgrade Documents and Links

Components

200KV 15 deg dipole
200KV gun BPM's
200kV Wien Filter
Injector Solenoids Upgrade
200kV Quadrupoles
200kV PSS Kicker
200kV Prebuncher
200kV Choppers
Vacuum Upgrades
A1 Aperture Motor Control

ATLIS Tasks

AIPINJ

Non-AIPINJ