==Planning, planning, planning...==
 
==Planning, planning, planning...==
 
; [[AIPINJ - Phase 1 and 2 Schedule]]
 
; [[AIPINJ - Phase 1 and 2 Schedule]]
 +
; [[AIPINJ Layouts]]
  
 
; [[Injector Upgrade Meetings]]
 
; [[Injector Upgrade Meetings]]
  
 
=== [https://jeffersonlab-my.sharepoint.com/:f:/g/personal/grames_jlab_org/EhXqNtq16CBNt4JzMmy4T1ABpR9qdRQQGacUVwrDGi9DEw?e=Gb8Y85 Link to AIPINJ OneDrive folder] ===
 
=== [https://jeffersonlab-my.sharepoint.com/:f:/g/personal/grames_jlab_org/EhXqNtq16CBNt4JzMmy4T1ABpR9qdRQQGacUVwrDGi9DEw?e=Gb8Y85 Link to AIPINJ OneDrive folder] ===
 
=== [[AIPINJ Layouts]] ===
 
 
=== [[Injector Upgrade Documents and Links]] ===
 
  
 
== Major Beamline Components ==
 
== Major Beamline Components ==
Line 41: Line 38:
 
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/19463 New Gun2 loading chamber]
 
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/19463 New Gun2 loading chamber]
 
* Placeholder for Tim Minga to test laser room smoke detector alarm to MCC/Guard
 
* Placeholder for Tim Minga to test laser room smoke detector alarm to MCC/Guard
 +
 +
==Technical Notes==
 +
=== [[Injector Upgrade Documents and Links]] ===

Revision as of 14:37, 27 August 2020

This area is related to Injector Upgrade Meetings

Planning, planning, planning...

AIPINJ - Phase 1 and 2 Schedule
AIPINJ Layouts
Injector Upgrade Meetings

Link to AIPINJ OneDrive folder

Major Beamline Components

DR dipole (15 deg) - New 15 deg air core bend dipole replaces pre-existing DS dipole
FX beamline and FY chopper solenoids - New double-coil sw/cw capable solenoids with 38 mm (FX) and 46 mm (FY) ID
PSS Kicker (upgraded for 200 kV upgrade) - New PSS kicker has been designed to operate at higher momentum and with more reliable design
WF Wien Filters (200 kV upgrade) - Wien filters are upgraded with new coils (20 A) and new high voltage (+/- 18 kV) for operation at 200 keV
QW Wien quadrupoles (200 kV upgrade) - New quadrouple are designed for higher 200 keV energy, but also of improved magnetic design w/ minimized dipole component
Chopping System (200 kV upgrade)
Pre-buncher cavity (200 kV upgrade)
NEG coated 2.5 inch OD BPM's
A1/A2 Aperture Steering Cubes - Reinvented A1/A2 apertures define beam size and PSS kicker destination, include upgraded HD steering coils
Injector upgrade vacuum improvements - Improvements in the vacuum design, use of getter and ion pumps

ATLIS Tasks

AIPINJ
RSRSRC

Technical Notes

Injector Upgrade Documents and Links