Difference between revisions of "CEBAF Injector Upgrade"
Jump to navigation
Jump to search
(27 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
This area is related to Injector Upgrade Meetings | This area is related to Injector Upgrade Meetings | ||
− | == | + | ==Planning, planning, planning...== |
− | :: | + | : [[AIPINJ - Phase 1 and 2 Schedule]] |
− | : | + | : [[AIPINJ - Layouts]] |
− | :: | + | : [[AIPINJ - Upgrade Meetings]] |
− | :: | + | : [https://jeffersonlab-my.sharepoint.com/:f:/g/personal/grames_jlab_org/EhXqNtq16CBNt4JzMmy4T1ABpR9qdRQQGacUVwrDGi9DEw?e=Gb8Y85 Link to AIPINJ OneDrive folder] |
− | == | + | == Major Beamline Components == |
− | + | :[[DR dipole (15 deg)]] - New 15 deg air core bend dipole replaces pre-existing DS dipole | |
− | + | :[[FX beamline and FY chopper solenoids]] - New double-coil sw/cw capable solenoids with 38 mm (FX) and 46 mm (FY) ID | |
− | + | :[[PSS Kicker (upgraded for 200 kV upgrade)]] - New PSS kicker of reliable design to operate at 200 kV with shorter throw | |
− | + | :[[WF Wien Filters (200 kV upgrade)]] - Upgraded Wien filters with 20 A magnetic coils and >18 kV electrodes to rotate spin of 200 keV electrons | |
− | + | :[[QW Wien quadrupoles (200 kV upgrade)]] - New quads designed for 200 keV energy, w/ improved magnetic field quality | |
− | + | :[[Chopping System (200 kV upgrade)]] - Choppers get higher power amplifiers, maybe a new chopping chamber | |
− | + | :[[Pre-buncher cavity (200 kV upgrade)]] - Existing stainless steel pre-buncher replaced by copper cavity for higher power. | |
− | + | :[[NEG coated 2.5 inch OD BPM's]] - Replacing (2) existing with (3) new BPM's, provide (x,x',y,y') from gun, help tuning | |
− | + | :[[A1/A2 Aperture Steering Cubes]] - Reinvented A1/A2 apertures define beam size and PSS kicker destination, include upgraded HD steering coils | |
− | + | :[[Injector upgrade vacuum improvements]] - Improvements in the vacuum design, use of getter and ion pumps | |
− | + | :[[SRF Booster]] | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
==ATLIS Tasks== | ==ATLIS Tasks== | ||
− | + | ;AIPINJ | |
+ | * [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21145 PSS Injector Segment PLC Upgrade] | ||
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20415 Injector Camac to Vme and camera upgrade] | * [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20415 Injector Camac to Vme and camera upgrade] | ||
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20395 Pedestal Location Surveys] | * [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20395 Pedestal Location Surveys] | ||
Line 40: | Line 34: | ||
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20268 Remove and calibrate current monitoring electronics] | * [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20268 Remove and calibrate current monitoring electronics] | ||
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/17932 Harp work] | * [http://devweb.acc.jlab.org/CSUEApps/atlis/task/17932 Harp work] | ||
− | + | ;RSRSRC | |
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/19463 New Gun2 loading chamber] | * [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/19463 New Gun2 loading chamber] | ||
* Placeholder for Tim Minga to test laser room smoke detector alarm to MCC/Guard | * Placeholder for Tim Minga to test laser room smoke detector alarm to MCC/Guard | ||
+ | |||
+ | === [[Injector Upgrade Documents and Links]] === |
Revision as of 15:26, 27 August 2020
This area is related to Injector Upgrade Meetings
Planning, planning, planning...
- AIPINJ - Phase 1 and 2 Schedule
- AIPINJ - Layouts
- AIPINJ - Upgrade Meetings
- Link to AIPINJ OneDrive folder
Major Beamline Components
- DR dipole (15 deg) - New 15 deg air core bend dipole replaces pre-existing DS dipole
- FX beamline and FY chopper solenoids - New double-coil sw/cw capable solenoids with 38 mm (FX) and 46 mm (FY) ID
- PSS Kicker (upgraded for 200 kV upgrade) - New PSS kicker of reliable design to operate at 200 kV with shorter throw
- WF Wien Filters (200 kV upgrade) - Upgraded Wien filters with 20 A magnetic coils and >18 kV electrodes to rotate spin of 200 keV electrons
- QW Wien quadrupoles (200 kV upgrade) - New quads designed for 200 keV energy, w/ improved magnetic field quality
- Chopping System (200 kV upgrade) - Choppers get higher power amplifiers, maybe a new chopping chamber
- Pre-buncher cavity (200 kV upgrade) - Existing stainless steel pre-buncher replaced by copper cavity for higher power.
- NEG coated 2.5 inch OD BPM's - Replacing (2) existing with (3) new BPM's, provide (x,x',y,y') from gun, help tuning
- A1/A2 Aperture Steering Cubes - Reinvented A1/A2 apertures define beam size and PSS kicker destination, include upgraded HD steering coils
- Injector upgrade vacuum improvements - Improvements in the vacuum design, use of getter and ion pumps
- SRF Booster
ATLIS Tasks
- AIPINJ
- PSS Injector Segment PLC Upgrade
- Injector Camac to Vme and camera upgrade
- Pedestal Location Surveys
- Install Chopper SSA's
- Chopper SSA LCW
- Penetration Drops
- Testing Wien HV Controls at UITF
- Accelerator network re-survey
- Remove and re-install BPM's Gun to chopper
- Install new IPM2I03
- Remove and calibrate current monitoring electronics
- Harp work
- RSRSRC
- New Gun2 loading chamber
- Placeholder for Tim Minga to test laser room smoke detector alarm to MCC/Guard