==ATLIS Tasks==
 +
=== AIPINJ ===
 +
* [http://devweb.acc.jlab.org/CSUEApps/uitflist/task/1273 Testing Wien HV Controls at UITF]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/18471 Accelerator network re-survey]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20270 Remove and re-install BPM's Gun to chopper]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20275 Install new IPM2I03]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20268 Remove and calibrate current monitoring electronics]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/17932 Harp work]
 +
=== Non-AIPINJ ===
 +
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/19463 New Gun2 loading chamber]
 +
* Placeholder for Tim Minga to test laser room smoke detector alarm to MCC/Guard
 +
 +
==Quick links==
 +
* [https://jeffersonlab-my.sharepoint.com/:f:/g/personal/grames_jlab_org/EhXqNtq16CBNt4JzMmy4T1ABNsJ15YGBFTQkkMenD_ommQ Link to AIPINJ OneDrive folder]
 +
* [[AIPINJ Layouts]]
 +
 +
==Injector upgrade calendar==
 +
:: Run (now - May 6)
 +
:: Phase 1 (May 6 - end of 2020)
 +
:: Run (Jan 2021 - Sep 13 2021)
 +
:: Phase 2 (Sep 13 - end of 2021)
 +
  
 
=== [[Injector Upgrade Documents and Links]] ===
 
=== [[Injector Upgrade Documents and Links]] ===

Revision as of 13:26, 13 February 2020

This area is related to Injector Upgrade Meetings

Injector Upgrade Meetings

Link to AIPINJ OneDrive folder

AIPINJ Layouts

Components

200KV 15 deg dipole
200kV Wien Filter
Injector Solenoids Upgrade
200kV Quadrupoles
Vacuum Upgrades

ATLIS Tasks

AIPINJ

Non-AIPINJ

Quick links

Injector upgrade calendar

Run (now - May 6)
Phase 1 (May 6 - end of 2020)
Run (Jan 2021 - Sep 13 2021)
Phase 2 (Sep 13 - end of 2021)


Injector Upgrade Documents and Links