Line 3: Line 3:
 
==Planning, planning, planning...==
 
==Planning, planning, planning...==
 
; [[AIPINJ - Phase 1 and 2 Schedule]]
 
; [[AIPINJ - Phase 1 and 2 Schedule]]
; [[AIPINJ Layouts]]
 
 
; [[AIPINJ - Layouts]]
 
; [[AIPINJ - Layouts]]
 +
; [[AIPINJ - Upgrade Meetings]]
  
 
; [[Injector Upgrade Meetings]]
 
; [[Injector Upgrade Meetings]]

Revision as of 14:49, 27 August 2020

This area is related to Injector Upgrade Meetings

Planning, planning, planning...

AIPINJ - Phase 1 and 2 Schedule
AIPINJ - Layouts
AIPINJ - Upgrade Meetings
Injector Upgrade Meetings

Link to AIPINJ OneDrive folder

Major Beamline Components

DR dipole (15 deg) - New 15 deg air core bend dipole replaces pre-existing DS dipole
FX beamline and FY chopper solenoids - New double-coil sw/cw capable solenoids with 38 mm (FX) and 46 mm (FY) ID
PSS Kicker (upgraded for 200 kV upgrade) - New PSS kicker has been designed to operate at higher momentum and with more reliable design
WF Wien Filters (200 kV upgrade) - Wien filters are upgraded with new coils (20 A) and new high voltage (+/- 18 kV) for operation at 200 keV
QW Wien quadrupoles (200 kV upgrade) - New quadrouple are designed for higher 200 keV energy, but also of improved magnetic design w/ minimized dipole component
Chopping System (200 kV upgrade)
Pre-buncher cavity (200 kV upgrade)
NEG coated 2.5 inch OD BPM's
A1/A2 Aperture Steering Cubes - Reinvented A1/A2 apertures define beam size and PSS kicker destination, include upgraded HD steering coils
Injector upgrade vacuum improvements - Improvements in the vacuum design, use of getter and ion pumps
SRF Booster

ATLIS Tasks

AIPINJ
RSRSRC

Technical Notes

Injector Upgrade Documents and Links