Difference between revisions of "CEBAF Injector Upgrade"

From Ciswikidb
Jump to navigation Jump to search
(105 intermediate revisions by 2 users not shown)
Line 1: Line 1:
This area is related to Injector Upgrade Meetings
+
The Injector Upgrade begins here.
  
==Injector upgrade calendar==
+
==Meeting Links==
:: Run (now - May 6)
+
* Daily 8:00am + Wed 1:30 MCC => https://bluejeans.com/569476853
:: Phase 1 (May 6 - end of 2020)
+
* Daily 8:30am toolbox => https://bluejeans.com/171126028
:: Run (Jan 2021 - Sep 13 2021)
+
* Steve's Monday 1:30 Meeting =>  https://bluejeans.com/569476853
:: Phase 2 (Sep 13 - end of 2021)
 
  
=== [[Injector Upgrade Meetings]] ===
+
== Phase 1 & 2 portal==
 +
* [[Phase 1]] - Gun to Chopper (Long SAD Sep 2020 - Jul 2021)
 +
* [[Phase 2]] - Chopper to Booster
  
=== [https://jeffersonlab-my.sharepoint.com/:f:/g/personal/grames_jlab_org/EhXqNtq16CBNt4JzMmy4T1ABpR9qdRQQGacUVwrDGi9DEw?e=Gb8Y85 Link to AIPINJ OneDrive folder] ===
+
==General Info==
 
+
* [https://jeffersonlab-my.sharepoint.com/:f:/g/personal/grames_jlab_org/EhXqNtq16CBNt4JzMmy4T1ABbL3OnBkCCHeIvb8PQE3aZw?e=vpc8ZM AIPINJ - Sharepoint (3D models, drawings, data)]
=== [[AIPINJ Layouts]] ===
+
* [[AIPINJ - Layouts]]
 
+
* [[AIPINJ - S&A Transmittals]]
=== [[Injector Upgrade Documents and Links]] ===
+
* [[AIPINJ - CED]]
 
+
* [[Injector Upgrade Documents and Links]]
== Upgrade Components ==
 
:[[DR dipole (15 deg)]] - New 15 deg air core bend dipole replaces pre-existing DS dipole
 
:[[FX beamline and FY chopper solenoids]] - New double-coil sw/cw capable solenoids with 38 mm (FX) and 46 mm (FY) ID
 
:[[PSS Kicker (upgraded for 200 kV upgrade)]] - New PSS kicker has been designed to operate at higher momentum and with more reliable design
 
:[[WF Wien Filters (200 kV upgrade)]] - Wien filters are upgraded with new coils (20 A) and new high voltage (+/- 18 kV) for operation at 200 keV
 
:[[QW Wien quadrupoles (200 kV upgrade)]] - New quadrouple are designed for higher 200 keV energy, but also of improved magnetic design w/ minimized dipole component
 
:[[Chopping System (200 kV upgrade)]]
 
 
 
 
 
:[[200KV gun BPM's]]
 
:[[NEG coated 2.5 inch OD BPM's]]
 
 
 
:[[Prebuncher]]
 
:[[Pre-buncher cavity (200 kV upgrade)]]
 
 
 
::[[Vacuum Upgrades]]
 
::[[A1 Aperture Motor Control]]
 
 
 
==ATLIS Tasks==
 
=== AIPINJ ===
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21145 PSS Injector Segment PLC Upgrade]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20415 Injector Camac to Vme and camera upgrade]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20395 Pedestal Location Surveys]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20404 Install Chopper SSA's]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20410 Chopper SSA LCW]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/19517 Penetration Drops]
 
* [http://devweb.acc.jlab.org/CSUEApps/uitflist/task/1273 Testing Wien HV Controls at UITF]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/18471 Accelerator network re-survey]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20270 Remove and re-install BPM's Gun to chopper]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20275 Install new IPM2I03]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20268 Remove and calibrate current monitoring electronics]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/17932 Harp work]
 
=== Non-AIPINJ ===
 
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/19463 New Gun2 loading chamber]
 
* Placeholder for Tim Minga to test laser room smoke detector alarm to MCC/Guard
 

Revision as of 20:35, 4 May 2021

The Injector Upgrade begins here.

Meeting Links

Phase 1 & 2 portal

  • Phase 1 - Gun to Chopper (Long SAD Sep 2020 - Jul 2021)
  • Phase 2 - Chopper to Booster

General Info