Difference between revisions of "CEBAF Injector Upgrade"

From Ciswikidb
Jump to navigation Jump to search
(192 intermediate revisions by 7 users not shown)
Line 1: Line 1:
 +
The Injector Upgrade begins here.
  
* <span style="font-size:150%"> '''[[CEBAF Injector Upgrade Meetings]]''' </span>
+
==Meeting Links==
 +
* Daily 8:00am + Wed 1:30 MCC => https://bluejeans.com/569476853
 +
* Daily 8:30am toolbox => https://bluejeans.com/171126028
 +
* Steve's Monday 1:30 Meeting =>  https://bluejeans.com/569476853
  
 +
== Phase 1 & 2 portal==
 +
* [[Phase 1]] - Gun to Chopper (Long SAD Sep 2020 - Jul 2021)
 +
* [[Phase 2]] - Chopper to Booster
  
 
+
==General Info==
A significant portion of the experiments performed at Jefferson Lab require a polarized electron beam. A subset of these are parity violation experiments which have exceptionally stringent requirements on the quality of the electron beam. As the sign of the electron beam helicity reverses at the target of the experiment no other measurable quantity of the electron beam may change.  This includes the beam intensity, polarization, position, angle, energy or spot size.
+
* [https://jeffersonlab-my.sharepoint.com/:f:/g/personal/grames_jlab_org/EhXqNtq16CBNt4JzMmy4T1ABbL3OnBkCCHeIvb8PQE3aZw?e=vpc8ZM AIPINJ - Sharepoint (3D models, drawings, data)]
 
+
* [[AIPINJ - Layouts]]
To ensure this beam quality, a significant effort is put into the main injector where the laser beam and electron photogun combine to produce the intended electron beam and the beam is chopped, bunched and accelerated to the final injector energy, all while maintaining a parity quality electron beam (PQB).
+
* [[AIPINJ - S&A Transmittals]]
 
+
* [[AIPINJ - CED]]
=='''Accelerator Meetings'''==
+
* [[Injector Upgrade Documents and Links]]
 
 
* CEBAF Injector Upgrade Meeting August 27, 2015: [[media:PQB_Meeting_13Aug09.pdf]] [[media:PQB_Meeting_13Aug09.pptx]]
 

Revision as of 20:35, 4 May 2021

The Injector Upgrade begins here.

Meeting Links

Phase 1 & 2 portal

  • Phase 1 - Gun to Chopper (Long SAD Sep 2020 - Jul 2021)
  • Phase 2 - Chopper to Booster

General Info