Difference between revisions of "CEBAF Injector Upgrade"

From Ciswikidb
Jump to navigation Jump to search
Line 13: Line 13:
 
# Reza Kazimi, ''Some items to improve the injector operation'': [[media:improve_injector_operation_kazimi.pptx]]
 
# Reza Kazimi, ''Some items to improve the injector operation'': [[media:improve_injector_operation_kazimi.pptx]]
 
# Minutes: [[media:Inj_Upgrade_Meeting_27Aug2015.pdf]]
 
# Minutes: [[media:Inj_Upgrade_Meeting_27Aug2015.pdf]]
 +
 +
* CEBAF Injector Upgrade Meeting September 10, 2015:
 +
# ''Considerations for CEBAF Injector Upgrade'': [[media:150824_Upgrade_Grames.pdf]]
 +
# Jay Benesch, ''Advanced Injector - possible specs'': [[media:advanced_injector_specs_10sep2015.pdf]]
 +
# Waiting for Reza's input here
 +
# Minutes: [[media:Minutes_for_Full_Energy_Inj_Meeting_10Sept2015.pdf]]

Revision as of 08:56, 11 September 2015

Introduction

This set of meetings is intended to describe the design, planning and installation of a new injector in the CEBAF accelerator.



Accelerator Meetings

  • CEBAF Injector Upgrade Meeting August 27, 2015:
  1. Joe Grames, Considerations for CEBAF Injector Upgrade: media:150824_Upgrade_Grames.pdf
  2. Jay Benesch, Advanced Injector: media:advanced_injector_benesch.pdf
  3. Reza Kazimi, Some items to improve the injector operation: media:improve_injector_operation_kazimi.pptx
  4. Minutes: media:Inj_Upgrade_Meeting_27Aug2015.pdf
  • CEBAF Injector Upgrade Meeting September 10, 2015:
  1. Considerations for CEBAF Injector Upgrade: media:150824_Upgrade_Grames.pdf
  2. Jay Benesch, Advanced Injector - possible specs: media:advanced_injector_specs_10sep2015.pdf
  3. Waiting for Reza's input here
  4. Minutes: media:Minutes_for_Full_Energy_Inj_Meeting_10Sept2015.pdf