This area is related to Injector Upgrade Meetings

Injector upgrade calendar

Run (now - May 6)
Phase 1 (May 6 - end of 2020)
Run (Jan 2021 - Sep 13 2021)
Phase 2 (Sep 13 - end of 2021)

Injector Upgrade Meetings

Link to AIPINJ OneDrive folder

AIPINJ Layouts

Injector Upgrade Documents and Links

Upgrade Components

DR dipole (15 deg) - New 15 deg air core bend dipole replaces pre-existing DS dipole
Injector Solenoids Upgrade
FX beamline and FY chopper solenoids - New double-coil sw/cw capable solenoids with 38 mm (FX) and 46 mm (FY) ID
200kV PSS Kicker
PSS Kicker (upgraded for 200 kV upgrade)
200kV Wien Filter
WF Wien Filters (200 kV upgrade)
200kV Quadrupoles
QW Wien quadrupoles (200 kV upgrade)
200KV gun BPM's
NEG coated 2.5 inch OD BPM's
Prebuncher
Pre-buncher cavity (200 kV upgrade)
200kV Choppers
Chopper amplifiers (200 kV upgrade)
Vacuum Upgrades
A1 Aperture Motor Control

ATLIS Tasks

AIPINJ

Non-AIPINJ