CEBAF Injector Upgrade

From Ciswikidb
Revision as of 07:44, 28 September 2015 by Rlegg (talk | contribs)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Introduction

This set of meetings is intended to describe the design, planning and installation of a new injector in the CEBAF accelerator.



Accelerator Meetings

  • CEBAF Injector Upgrade Meeting August 27, 2015:
  1. Joe Grames, Considerations for CEBAF Injector Upgrade: media:150824_Upgrade_Grames.pdf
  2. Jay Benesch, Advanced Injector: media:advanced_injector_benesch.pdf
  3. Reza Kazimi, Some items to improve the injector operation: media:improve_injector_operation_kazimi.pptx
  4. Minutes: media:Inj_Upgrade_Meeting_27Aug2015.pdf
  • CEBAF Injector Upgrade Meeting September 10, 2015:
  1. AIP Full Energy Injector Upgrade charter: media:INJ_Full_Energy_Injector_Upgrade_charter.pdf
  2. Jay Benesch, Advanced Injector - possible specs: media:advanced_injector_specs_10sep2015.pdf
  3. Reza Kazimi, Full Energy Injector Upgrade: media:FullInjTalk_09-10-2015v4.pdf
  4. Minutes: media:Minutes_for_Full_Energy_Inj_Meeting_10Sept2015.pdf
  • CEBAF Injector Upgrade Meeting September 25, 2015:
  1. Reza Kazimi, Simulations of injector aperture: media:ApertureCheckv04.pptx
  2. Minutes: media:Full_Energy_Injector_Meeting_25 September 25.pdf
  • Additional Materials
  1. Jay Benesch, Injector Incremental Improvements: media:Injector_incremental_improvement_list.pdf
  2. Jay Benesch, Wien Filter Upgrade: media:Wien_filter_revision.pdf