Difference between revisions of "CIS Safety"

From Ciswikidb
Jump to navigation Jump to search
(11 intermediate revisions by 2 users not shown)
Line 3: Line 3:
 
These procedures are managed via document control with links to individual procedures as shown below, but these documents can also be found using the search tool at this link: https://mis.jlab.org/mis/apps/mis_forms/search_operational_safety_procedure_forms.cfm
 
These procedures are managed via document control with links to individual procedures as shown below, but these documents can also be found using the search tool at this link: https://mis.jlab.org/mis/apps/mis_forms/search_operational_safety_procedure_forms.cfm
  
CEBAF Injector Laser Cleanroom (ACC-18-76974-LOSP), valid through 5/26/2021: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=76974
+
* CEBAF Injector Laser Cleanroom (ACC-18-76974-LOSP), valid through 5/26/2021: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=76974
  
CEBAF Injector Laser System (ACC-19-94369-LOSP), valid through 10/31/2022: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=94369
+
* CEBAF Injector Laser System (ACC-19-94369-LOSP), valid through 10/31/2022: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=94369
  
CEBAF Battery Bias Box, Draft OSP [[media:DraftOSP_Battery_bias_box_maintenance.docx]] and Task Hazard Analysis [[media:draftTHA_battery_bias_box_maintenance.docx]]
+
* CEBAF Battery Bias Box, Draft OSP [[media:DraftOSP_Battery_bias_box_maintenance.docx]] and Task Hazard Analysis [[media:draftTHA_battery_bias_box_maintenance.docx]]
  
;Official documents managed via document-control
+
* DC Power OSP De-energizing 10 Amp Trim Rack with application of Lock, Tag and Try (LT&T) at CEBAF, LERF, UITF, GTS (ENG-20-103293-OSP)  : https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=103293
 +
* Wien filter high voltage measurement using voltage divider box (ACC-20-108912-OSP), valid through 11/19/2023: [https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=108912
 +
** [[Media:operational_safety_procedure_form_108912.pdf]]]
  
CEBAF Injector Power Supply SF6 Tank & 350 kV Receptacle (PS-ACC-17-001) https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38417
+
;Official documents managed via document-control for CEBAF
  
CEBAF Industrial Hygiene Assessment for SF6 exposure evaluated June 2018 by Jennifer Williams : requested link to official assessment
+
* CEBAF accelerator MEDCON 5 loading limits (IH1000-04g), circulated S. Hoey 9/29/20: [[media:loading limits_CEBAF ih1000004g_v4.docx]]
 +
 
 +
* IH Exposure Assessment: Injector Tunnel, Sulfur hexafluoride (SF6) (IH Project # 18OT137) Prepared by: Jennifer Williams, CIH [[media:18OT137.pdf]]
 +
 
 +
* CEBAF Injector Power Supply SF6 Tank & 350 kV Receptacle (PS-ACC-17-001) https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38417
 +
 
 +
* CEBAF Industrial Hygiene Assessment for SF6 exposure evaluated June 2018 by Jennifer Williams : requested link to official assessment
  
 
;Other documents not managed via document-control
 
;Other documents not managed via document-control
  
DILO SF6 Transfer and Recovery OLD STYLE Cart Tech Manual: [[File:D-320-R006 B143R01 Manual E Rev 06_21_2012.pdf]]
+
* DILO SF6 Transfer and Recovery OLD STYLE Cart Tech Manual: [[File:D-320-R006 B143R01 Manual E Rev 06_21_2012.pdf]]
 +
 
 +
* DILO SF6 Transfer and recovery NEW (2019) Cart specs: [[File:B143R11 Data Sheet.pdf]]
 +
 
 +
* SF6 Inventory log and calculation sheets are located at:O:\inj_group\SF6 Gas Management and Inventory
 +
 
 +
* Task Hazard Analysis for NEG sputter coating [[media:THA_NEGSputtering.docx]]
  
DILO SF6 Transfer and recovery NEW (2019) Cart specs: [[File:B143R11 Data Sheet.pdf]]
+
* NFPA posting for chambers containing NEG materials from Jennifer Williams [[media:NEG component_ nfpa.docx]]
  
SF6 Inventory log and calculation sheets are located at:O:\inj_group\SF6 Gas Management and Inventory
+
;OSPs, TOSPs and LOSPs for LERF
  
Task Hazard Analysis for NEG sputter coating [[media:THA_NEGSputtering.docx]]
+
* LERF Gun High Voltage Conditioning OSP, valid through 11/10/2021 [[Media:LERF gun OSP HV conditioning_80619_signed-off.pdf]]
  
NFPA posting for chambers containing NEG materials from Jennifer Williams [[media:NEG component_ nfpa.docx]]
+
* LERF Gun photocathode re-cesiation (QE replenishing) DRAFT procedure [[Media:LERF Gun photocathode re-cesiation OSP.docx]]

Revision as of 09:46, 23 November 2020

OSPs, TOSPs and LOSPs for CEBAF

These procedures are managed via document control with links to individual procedures as shown below, but these documents can also be found using the search tool at this link: https://mis.jlab.org/mis/apps/mis_forms/search_operational_safety_procedure_forms.cfm

Official documents managed via document-control for CEBAF
  • IH Exposure Assessment: Injector Tunnel, Sulfur hexafluoride (SF6) (IH Project # 18OT137) Prepared by: Jennifer Williams, CIH media:18OT137.pdf
  • CEBAF Industrial Hygiene Assessment for SF6 exposure evaluated June 2018 by Jennifer Williams : requested link to official assessment
Other documents not managed via document-control
  • SF6 Inventory log and calculation sheets are located at:O:\inj_group\SF6 Gas Management and Inventory
OSPs, TOSPs and LOSPs for LERF