Difference between revisions of "Dec 13, 2022 - CIS Group meeting"

From Ciswikidb
Jump to navigation Jump to search
Line 12: Line 12:
 
** J. Grames et al., "Status of Ce+BAF: Polarized Positron Beam Capability at CEBAF 12 GeV" [[media:abstract-1313.pdf]]
 
** J. Grames et al., "Status of Ce+BAF: Polarized Positron Beam Capability at CEBAF 12 GeV" [[media:abstract-1313.pdf]]
 
** R. Kazimi et al., "Polarized Electron Injector for Positron Capability at CEBAF 12 GeV" [[media:abstract-1917.pdf]]
 
** R. Kazimi et al., "Polarized Electron Injector for Positron Capability at CEBAF 12 GeV" [[media:abstract-1917.pdf]]
** S. Pokharel et al., "Multi-Objective Genetic Optimization of the CEBAF Injector at 200 kV"  [media:Sunil-IPAC23.pdf]]
+
** S. Pokharel et al., "Multi-Objective Genetic Optimization of the CEBAF Injector at 200 kV"  [[media:Sunil-IPAC23.pdf]]
 
** M. Rahman et al., "Quantum Efficiency and Lifetime Study for Negative Electron Affinity GaAs Nanopillar Array Photocathode" [[media:IPAC23 abstract_Aziz.pdf]]
 
** M. Rahman et al., "Quantum Efficiency and Lifetime Study for Negative Electron Affinity GaAs Nanopillar Array Photocathode" [[media:IPAC23 abstract_Aziz.pdf]]
 
** A. Ushakov et al, "Conceptual Design of a High-Power Target for Positron Production at CEBAF" [[media:abstract-1794.pdf]]
 
** A. Ushakov et al, "Conceptual Design of a High-Power Target for Positron Production at CEBAF" [[media:abstract-1794.pdf]]

Revision as of 11:28, 13 December 2022

Agenda

Announcements

  • Early timesheet on Wed 12/14 for work planned through 12/15
  • Holiday Break (Dec 23 - Jan 2)
    • Dec. 23, 26, 30 and Jan. 2 (use Holiday)
    • Dec. 27, 28, 29 (use Vacation, otherwise LWOP let me know ... follow lab policy)
    • Working or on-site during the break? Tell me by Monday, Dec. 19.
  • IPAC'23 ... CIS
  • IPAC'23 ... CASA
    • A. Sy et al., "Degrader beamline design at the CEBAF injector for machine acceptance studies" media:Amy_Sy-IPAC23.pdf

Group Updates

  • 200 kV gun job at UITF (Marcy, Jessica, Phil, Carlos),
  • Plan for CEBAF from now until the SAD begins (Shukui, Steve, Riad),
  • Update on the R&D in GTS (Gabriel) and TL1137 (Mamun, Marcy),
  • JLAB/SLAC/KEK e-/e+ R&D proposal (Andriy, Carlos, Joe, Mamun, Reza, Silviu) media:US-Japan-Topics.pptx
  • Plan to irradiate target foils with e- beam and laser at LERF Lab 6 (Andriy, Shukui, Silviu, Sandesh, Mamun) media:2022-12-13-Target-Tests.pptx