Difference between revisions of "Dec 8, 2021 - Group meeting"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "==Meeting Coordinates== * We will on Wednesday at 10am @ TL-1227 * Bluejeans available if we need it: https://bluejeans.com/7572697097 The ME group will join us for this Wed...")
 
 
(One intermediate revision by the same user not shown)
Line 5: Line 5:
 
The ME group will join us for this Wednesday's meeting ... here are the topics we'll discuss
 
The ME group will join us for this Wednesday's meeting ... here are the topics we'll discuss
  
===Status Reports===
+
===SAD readiness===
* 200 kV gun jobs
+
* Modify top-hat
: insulator/cathode
+
* Install 12 GeV harp
: offset biased anode
+
* Re-install Mott target ladder
: Zao NEGs
 
: fiducials
 
: Layout/table at UITF & CEBAF
 
* ME - UITF and
 
* UITF Wien & Mott jobs
 
* UITF Mott and Wien
 
  
===Papers - by the holiday break submit to your favorite journal===
+
===200 kV gun jobs===
* Photocathode white paper - feedback by Friday welcome [[media:Spin_WhitePaper_rev3.docx]]
+
* insulator/cathode
* Biased anode, Joe
+
* offset biased anode
* Green fiber laser, Shukui
+
* Zao NEGs
* GTS magnetized beam paper, Riad -
+
* survey points
* Wien filter, Carlos
+
* Layout/table at UITF & CEBAF
 +
 
 +
===UITF Wien===
 +
* Beam line layout
 +
* Wien filter assembly
 +
* Wien quad crosses
 +
 
 +
===UITF Mott===
 +
* Mott line layout
 +
* Target ladder + targets
 +
* Collimators + detectors
 +
 
 +
===5 MeV Mott polarimeter===
 +
* as-built drawing package
  
 
===Standing Links===
 
===Standing Links===

Latest revision as of 12:50, 7 December 2021

Meeting Coordinates

The ME group will join us for this Wednesday's meeting ... here are the topics we'll discuss

SAD readiness

  • Modify top-hat
  • Install 12 GeV harp
  • Re-install Mott target ladder

200 kV gun jobs

  • insulator/cathode
  • offset biased anode
  • Zao NEGs
  • survey points
  • Layout/table at UITF & CEBAF

UITF Wien

  • Beam line layout
  • Wien filter assembly
  • Wien quad crosses

UITF Mott

  • Mott line layout
  • Target ladder + targets
  • Collimators + detectors

5 MeV Mott polarimeter

  • as-built drawing package

Standing Links