Difference between revisions of "Facility Overview"

From Ciswikidb
Jump to navigation Jump to search
Line 5: Line 5:
 
*[https://logbooks.jlab.org/entry/3906224| Commissioning Survey to Wastewater Target (9/16/21)]
 
*[https://logbooks.jlab.org/entry/3906224| Commissioning Survey to Wastewater Target (9/16/21)]
 
*[https://logbooks.jlab.org/entry/3899691| 150nA to FC3/4 @ 9.5 MeV (9/1/21)]
 
*[https://logbooks.jlab.org/entry/3899691| 150nA to FC3/4 @ 9.5 MeV (9/1/21)]
 +
*[https://logbooks.jlab.org/entry/3899629| FC3/4 (9/1/21)]
 +
*[http://devweb.acc.jlab.org/CSUEApps/uitflist/task/1652| 100nA surveys (9/1/21)]
 
*[https://logbooks.jlab.org/entry/3826561| 10uA @ 5.16 MeV (8/13/20)]
 
*[https://logbooks.jlab.org/entry/3826561| 10uA @ 5.16 MeV (8/13/20)]
 
*[https://logbooks.jlab.org/entry/3825053| 4 MeV Break point measurements (8/11/20)]
 
*[https://logbooks.jlab.org/entry/3825053| 4 MeV Break point measurements (8/11/20)]
 
*[https://logbooks.jlab.org/entry/3822177| 2 MeV Break point measurements (8/7/20)]
 
*[https://logbooks.jlab.org/entry/3822177| 2 MeV Break point measurements (8/7/20)]
 +
  
 
'Radcon Checklists'
 
'Radcon Checklists'
Line 17: Line 20:
 
*[https://logbooks.jlab.org/entry/3815691| MeV run '0' checklist (7/20/20)]
 
*[https://logbooks.jlab.org/entry/3815691| MeV run '0' checklist (7/20/20)]
 
*[https://logbooks.jlab.org/entry/3756316| 12/19/19 Commissioning Checklist]
 
*[https://logbooks.jlab.org/entry/3756316| 12/19/19 Commissioning Checklist]
 +
 +
BCM Calibration:
 +
[https://logbooks.jlab.org/entry/3896904| Linearity Test(8/25/21)]
 +
 +
Vacuum:
 +
[https://logbooks.jlab.org/entry/3895151| Valve Configuration]
 +
 +
Gun:
 +
[https://logbooks.jlab.org/entry/3894625| Puck bakery]
 +
[https://logbooks.jlab.org/entry/3889242| HV set point]
 +
[https://logbooks.jlab.org/entry/3889197| Gun Soak]
 +
[https://logbooks.jlab.org/entry/3889241| Operation over 180kV]
 +
 +
 +
Vibrations:
 +
[https://logbooks.jlab.org/entry/3902463| Powers (9/8/21)]
 +
[https://logbooks.jlab.org/entry/3896809| Owens Spectra (8/25/21)] - Owens work Nov. 2020

Revision as of 23:21, 25 September 2021