Difference between revisions of "Fall SAD 2019"

From Ciswikidb
Jump to: navigation, search
Line 9: Line 9:
  
 
;Gun2 HV chamber jobs
 
;Gun2 HV chamber jobs
 +
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19616 S&A job for new small shed going into CEBAF]
 
*[http://devweb.acc.jlab.org/CSUEApps/uitflist/task/1142 ATLIS to remove small shed from UITF and prep for CEBAF]
 
*[http://devweb.acc.jlab.org/CSUEApps/uitflist/task/1142 ATLIS to remove small shed from UITF and prep for CEBAF]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19462 Gun2 200kV cathode, 10kV anode, kr plumbing]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19462 Gun2 200kV cathode, 10kV anode, kr plumbing]

Revision as of 09:37, 20 August 2019

Pre-planning for Aug-Nov SAD 2019
Beam studies before SAD begins
Gun2 HV chamber jobs
Gun2 Load chamber jobs
Laser jobs
Make beam again jobs
AIPINJ
  • Last SAD before upgrade
  • Walk throughs and measurements
  • Remove oil tank
SAD Schedule and Beam Resstoration