*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19541 Test large shed electrode optics]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19541 Test large shed electrode optics]
 
*Bias anode [[media:190815_life.pptx]]
 
*Bias anode [[media:190815_life.pptx]]
 +
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19410 Bias Gun2 anode during PREX-II]
  
 
;Gun2 HV chamber jobs
 
;Gun2 HV chamber jobs
 +
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19616 S&A job for new small shed going into CEBAF]
 
*[http://devweb.acc.jlab.org/CSUEApps/uitflist/task/1142 ATLIS to remove small shed from UITF and prep for CEBAF]
 
*[http://devweb.acc.jlab.org/CSUEApps/uitflist/task/1142 ATLIS to remove small shed from UITF and prep for CEBAF]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19462 Gun2 200kV cathode, 10kV anode, kr plumbing]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19462 Gun2 200kV cathode, 10kV anode, kr plumbing]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19516 Pete's BPM Atlis]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19516 Pete's BPM Atlis]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19476 CEBAF Kr Gas HV Conditioning]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19476 CEBAF Kr Gas HV Conditioning]
 +
*[https://logbooks.jlab.org/entry/3723083 Logbook entry of 200 kV cathode assembly]
 +
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19690 Install 2nd decarad unit]
  
 
;Gun2 Load chamber jobs
 
;Gun2 Load chamber jobs
Line 18: Line 22:
  
 
;Laser jobs
 
;Laser jobs
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19465 Upgrade fiber laser connectors] [https://misportal.jlab.org/reqs/pr/viewPr.do?prNum=386979P req 1] [https://misportal.jlab.org/reqs/pr/viewPr.do?prNum=386983 req 2]
+
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19465 Upgrade fiber laser connectors] [https://misportal.jlab.org/reqs/pr/viewPr.do?prNum=386979P req 1]  
 +
[https://misportal.jlab.org/reqs/pr/viewPr.do?prNum=386983 req 2]
  
 
;Make beam again jobs
 
;Make beam again jobs
Line 28: Line 33:
 
*Last SAD before upgrade
 
*Last SAD before upgrade
 
*Walk throughs and measurements
 
*Walk throughs and measurements
*Remove oil tank
+
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19633 Remove oil tank]
  
 
;SAD Schedule and Beam Resstoration
 
;SAD Schedule and Beam Resstoration
 +
 +
;PQB - SAD & CREX
 +
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19679 post-PREX II QE and AP measurements]
 +
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19669 RTP & Spot Size measurements for PREX/CREX at 240,120,30Hz]
 +
*[http://opsweb.acc.jlab.org/CSUEApps/atlis/task/18799 Cathode Rotation/Alignment for CREX]
 +
*[http://opsweb.acc.jlab.org/CSUEApps/atlis/task/19670 RTP/IA/Parity Settings for all 4 lasers before CREX]
 +
*[http://opsweb.acc.jlab.org/CSUEApps/atlis/task/18793 RTP: Position Difference Feedback PartI to FC2/FC1 for CREX]
 +
 
* [https://accweb.acc.jlab.org/calendar/ SAD Calendar]
 