Difference between revisions of "Fall SAD 2019"

From Ciswikidb
Jump to navigation Jump to search
Line 1: Line 1:
;Pre-planning for Aug-Nov SAD 2019
+
;Planning Meetings
 
*[[media:190501_GunUpgradeJobs.docx]]
 
*[[media:190501_GunUpgradeJobs.docx]]
 
*[[media:30July2019_KryptonLine.pptx]]
 
*[[media:30July2019_KryptonLine.pptx]]
 
*[[Gun2 Load Lock Chamber Replacement]]
 
*[[Gun2 Load Lock Chamber Replacement]]
  
;Beam studies before SAD begins
+
;Beam Studies
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19541 Test large shed electrode optics]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19541 Test large shed electrode optics]
 
*Bias anode [[media:190815_life.pptx]]
 
*Bias anode [[media:190815_life.pptx]]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19410 Bias Gun2 anode during PREX-II]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19410 Bias Gun2 anode during PREX-II]
  
;Gun2 HV chamber jobs
+
;200 kV Gun Tasks
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19616 S&A job for new small shed going into CEBAF]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19616 S&A job for new small shed going into CEBAF]
 
*[http://devweb.acc.jlab.org/CSUEApps/uitflist/task/1142 ATLIS to remove small shed from UITF and prep for CEBAF]
 
*[http://devweb.acc.jlab.org/CSUEApps/uitflist/task/1142 ATLIS to remove small shed from UITF and prep for CEBAF]
Line 16: Line 16:
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19476 CEBAF Kr Gas HV Conditioning]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19476 CEBAF Kr Gas HV Conditioning]
 
*[https://logbooks.jlab.org/entry/3723083 Logbook entry of 200 kV cathode assembly]
 
*[https://logbooks.jlab.org/entry/3723083 Logbook entry of 200 kV cathode assembly]
 +
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19480 Testing CEBAF w/ 200 keV beam]
 +
 +
;AIPINJ Tasks
 +
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19633 Remove oil tank]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19690 Install 2nd decarad unit]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19690 Install 2nd decarad unit]
  
;Gun2 Load chamber jobs
+
;SAD Tasks
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19463 Upgrade the loading chamber]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19463 Upgrade the loading chamber]
 
;Laser jobs
 
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19465 Upgrade fiber laser connectors] [https://misportal.jlab.org/reqs/pr/viewPr.do?prNum=386979P req 1]  
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19465 Upgrade fiber laser connectors] [https://misportal.jlab.org/reqs/pr/viewPr.do?prNum=386979P req 1]  
 
[https://misportal.jlab.org/reqs/pr/viewPr.do?prNum=386983 req 2]
 
[https://misportal.jlab.org/reqs/pr/viewPr.do?prNum=386983 req 2]
  
;Make beam again jobs
 
*Activate a photocathode
 
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19612 Remove, inspect, install FC2]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19612 Remove, inspect, install FC2]
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19480 Testing CEBAF w/ 200 keV beam]
 
 
;AIPINJ
 
*Last SAD before upgrade
 
*Walk throughs and measurements
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19633 Remove oil tank]
 
 
;SAD Schedule and Beam Resstoration
 
  
 
;PQB - SAD & CREX
 
;PQB - SAD & CREX

Revision as of 12:56, 19 September 2019