(Created page with "==From last time== * Beam simulations * ME ** Gabriel provided Keith Harding with 3D model of the new Pierce cathode front end with 16 deg cone and 30 deg junction angle ** T...")
 
Line 6: Line 6:
 
** They have now a 3D model of the front end piece with the corresponding specs before polishing. This drawing is going to be sent to the machine shop for fabricating two samples. One sample will polished. Then th un-polished and polished samples will be measured (hole diameter) to estimate how much the size increases after polishing. After that the model will be updated and sent back to Gabriel for cross-checking. The expectation is that the dimensions, (particularly hole diameter) after polishing should match the ones of the 3D model used for simulations.
 
** They have now a 3D model of the front end piece with the corresponding specs before polishing. This drawing is going to be sent to the machine shop for fabricating two samples. One sample will polished. Then th un-polished and polished samples will be measured (hole diameter) to estimate how much the size increases after polishing. After that the model will be updated and sent back to Gabriel for cross-checking. The expectation is that the dimensions, (particularly hole diameter) after polishing should match the ones of the 3D model used for simulations.
 
** Machine shop expect to have the two samples ready by end of February.
 
** Machine shop expect to have the two samples ready by end of February.
 
+
* Technical Note
 
+
** Gabriel to start drafting a procedure for developing electric fields maps in CST starting from ME models and implementing them in GPT
 +
** Max to coordinate the procedure writing with Gabriel and with Alicia to capture steps for model validation with beam-based measurements, and with full injector GPT model
 +
*
  
 
==Discussion==
 
==Discussion==

Revision as of 12:54, 19 February 2024

From last time

  • Beam simulations
  • ME
    • Gabriel provided Keith Harding with 3D model of the new Pierce cathode front end with 16 deg cone and 30 deg junction angle
    • They have now a 3D model of the front end piece with the corresponding specs before polishing. This drawing is going to be sent to the machine shop for fabricating two samples. One sample will polished. Then th un-polished and polished samples will be measured (hole diameter) to estimate how much the size increases after polishing. After that the model will be updated and sent back to Gabriel for cross-checking. The expectation is that the dimensions, (particularly hole diameter) after polishing should match the ones of the 3D model used for simulations.
    • Machine shop expect to have the two samples ready by end of February.
  • Technical Note
    • Gabriel to start drafting a procedure for developing electric fields maps in CST starting from ME models and implementing them in GPT
    • Max to coordinate the procedure writing with Gabriel and with Alicia to capture steps for model validation with beam-based measurements, and with full injector GPT model

Discussion

  • Discuss the objectives of the next simulation

Path forward, conclusions

  • Simulations
  • ME


==