* SAD is coming ... [[media:SAD_discussion_300123.pdf]]
 
* SAD is coming ... [[media:SAD_discussion_300123.pdf]]
 +
* Matt's rough timeline [[media:230206_SAD_planning_meeting_with rough timeline.docx]]
 
* Warm girder assembly (upcoming plans, using UITF or LERF)
 
* Warm girder assembly (upcoming plans, using UITF or LERF)
 
* Status of UITF (booster, status of gun testing)
 
* Status of UITF (booster, status of gun testing)
* CEBAF "200 kV" jobs (vacuum/table "hooksup" of 200 kV gun, Phil's harp plan)
+
* CEBAF "200 kV" jobs (Marcy's vacuum "hook-ups", Carlos' HV Conditioning TOSP, Phil's plans for the harp)
  
 
=== Group Updates ===
 
=== Group Updates ===
Line 13: Line 14:
 
=== Upcoming Meetings/Dates ===
 
=== Upcoming Meetings/Dates ===
 
* February 10, Alex's deadline to update for March GSRA meeting
 
* February 10, Alex's deadline to update for March GSRA meeting
 +
 
* February 13, Xelera visit for e+ SBIR Phase 1 (Karl, Val, Colwyn, Joe)
 
* February 13, Xelera visit for e+ SBIR Phase 1 (Karl, Val, Colwyn, Joe)
 +
 
* March 5-10, APS Meeting, Las Vegas (Riad, Matt) - https://march.aps.org/
 
* March 5-10, APS Meeting, Las Vegas (Riad, Matt) - https://march.aps.org/
* March 7-8, U. Va. Positron Working Group Meeting, Charlottesville (Joe, Dennis, Sami, Andriy) - https://indico.jlab.org/event/680/
+
 
 +
* March 7-8, U. Va. Positron Working Group Meeting, Charlottesville - https://indico.jlab.org/event/680/
 +
** Joe Grames (20+5) - Ce+BAF concept and the challenging polarized e- source
 +
** Andriy Ushakov (15+5) - Positron target design and fatigue studies
 +
** Sami Habet (15+5) - Concept of a polarized positron injector for CEBAF
 +
** Dennis Turner (15+5) - Delivering e+ beams from LERF through Ce+BAF
 +
 
 
* March 8-10, JLab Accelerator Advisory Committee Review
 
* March 8-10, JLab Accelerator Advisory Committee Review
 
** Charge [[media:JLAAC_Charge_Mar_2023.docx]]
 
** Charge [[media:JLAAC_Charge_Mar_2023.docx]]
 
** Agenda [[media:JLab_AAC_Agenda_Mar_2023_v3.docx]]
 
** Agenda [[media:JLab_AAC_Agenda_Mar_2023_v3.docx]]
 +
 
* March 15, GSRA Annual Review (1-4 pm)
 
* March 15, GSRA Annual Review (1-4 pm)
 +
 
* March 20, SAD Begins
 
* March 20, SAD Begins
 +
 
** Shawn's recent calendar [[media:SAD_discussion_300123.pdf]]
 
** Shawn's recent calendar [[media:SAD_discussion_300123.pdf]]
 +
 
* March 23-24, KEK visit Yoshinori+
 
* March 23-24, KEK visit Yoshinori+
 +
 
* May 7-12, IPAC'23
 
* May 7-12, IPAC'23
 
** G. Blume et al., "A 5 MeV Compton transmission polarimeter designed for a SRF photogun". [[media:abstract-1233.pdf]]
 
** G. Blume et al., "A 5 MeV Compton transmission polarimeter designed for a SRF photogun". [[media:abstract-1233.pdf]]

Latest revision as of 08:29, 7 February 2023

Agenda

Upcoming CEBAF/UITF jobs

Group Updates

  • Upcoming meeting
  • Updates from around the room

Upcoming Meetings/Dates

  • February 10, Alex's deadline to update for March GSRA meeting
  • February 13, Xelera visit for e+ SBIR Phase 1 (Karl, Val, Colwyn, Joe)
  • March 7-8, U. Va. Positron Working Group Meeting, Charlottesville - https://indico.jlab.org/event/680/
    • Joe Grames (20+5) - Ce+BAF concept and the challenging polarized e- source
    • Andriy Ushakov (15+5) - Positron target design and fatigue studies
    • Sami Habet (15+5) - Concept of a polarized positron injector for CEBAF
    • Dennis Turner (15+5) - Delivering e+ beams from LERF through Ce+BAF
  • March 15, GSRA Annual Review (1-4 pm)
  • March 20, SAD Begins
  • March 23-24, KEK visit Yoshinori+

R&D/Project/Student updates