==Startup Tasks==
 
==Startup Tasks==
  
Laser Program
+
'''Laser Program'''
::A = 50uA @ 125 MHz or 100uA @ 250 MHz
+
:A = 50uA @ 125 MHz or 100uA @ 250 MHz
::B = 499
+
:B = 499
::C = 250
+
:C = 250
  
Laser hardware
+
'''Laser setup'''
::RTI testing
+
:No spare amps, 4-6 weeks from IPG for two replacement amps
 +
:Replace 2m (FWHM~1mm) spot lens with 1.5m (FWHM~0.4mm) lens
  
Phase flip
+
'''Phase flip'''
::Make divider box less sensitive to EMI?
+
:Make divider box less sensitive to EMI?
::Phase monitoring to keep phases between 3 lasers
+
:Phase monitoring to keep phases between 3 lasers
::Analog gain switching at 250 MHz
+
:Analog gain switching at 250 MHz
  
To Do
+
'''Change the laser phase'''
We will learn at separators if we need to add a phase delay.
+
:When we change the frequency use 0I04 viewer to check/set phase
We will decide by summer time a final system configuration
+
:Command line EPICS control sufficient now, Mike Johnson still working it
 +
:Tomas can provide a ~2ns delay cable
 +
:John can DAC control a phase delay ~2ns
  
No Amps, 4-6 weeks from IPG for two replacement amps
+
'''To Do'''
 +
:We will learn at separators if we need to add a phase delay
 +
:We will decide by summer time a final system configuration
 +
 
 +
:RTI testing

Revision as of 11:07, 11 February 2015

Startup Tasks

Laser Program

A = 50uA @ 125 MHz or 100uA @ 250 MHz
B = 499
C = 250

Laser setup

No spare amps, 4-6 weeks from IPG for two replacement amps
Replace 2m (FWHM~1mm) spot lens with 1.5m (FWHM~0.4mm) lens

Phase flip

Make divider box less sensitive to EMI?
Phase monitoring to keep phases between 3 lasers
Analog gain switching at 250 MHz

Change the laser phase

When we change the frequency use 0I04 viewer to check/set phase
Command line EPICS control sufficient now, Mike Johnson still working it
Tomas can provide a ~2ns delay cable
John can DAC control a phase delay ~2ns

To Do

We will learn at separators if we need to add a phase delay
We will decide by summer time a final system configuration
RTI testing