==Startup Tasks== | ==Startup Tasks== | ||
− | |||
'''Laser Program''' | '''Laser Program''' | ||
:A = 50uA @ 125 MHz or 100uA @ 250 MHz | :A = 50uA @ 125 MHz or 100uA @ 250 MHz | ||
Line 22: | Line 21: | ||
'''To Do''' | '''To Do''' | ||
− | :We will learn at separators if we | + | :We will learn at separators if we can flip A/D or D/A order |
:We will decide by summer time a final system configuration | :We will decide by summer time a final system configuration | ||
− | : | + | ==GTS== |
+ | '''SF6''' | ||
+ | :Bubba repaired leak, pumping now and check |
Revision as of 11:16, 11 February 2015
Startup Tasks
Laser Program
- A = 50uA @ 125 MHz or 100uA @ 250 MHz
- B = 499
- C = 250
Laser setup
- No spare amps, 4-6 weeks from IPG for two replacement amps
- Replace 2m (FWHM~1mm) spot lens with 1.5m (FWHM~0.4mm) lens
Phase flip
- Make divider box less sensitive to EMI?
- Phase monitoring to keep phases between 3 lasers
- Analog gain switching at 250 MHz
Change the laser phase
- When we change the frequency use 0I04 viewer to check/set phase
- Command line EPICS control sufficient now, Mike Johnson still working it
- Tomas can provide a ~2ns delay cable
- John can DAC control a phase delay ~2ns
To Do
- We will learn at separators if we can flip A/D or D/A order
- We will decide by summer time a final system configuration
GTS
SF6
- Bubba repaired leak, pumping now and check