Difference between revisions of "February 11, 2015 - CIS Group Meeting"

From Ciswikidb
Jump to navigation Jump to search
Line 1: Line 1:
 
==Startup Tasks==
 
==Startup Tasks==
 
 
'''Laser Program'''
 
'''Laser Program'''
 
:A = 50uA @ 125 MHz or 100uA @ 250 MHz
 
:A = 50uA @ 125 MHz or 100uA @ 250 MHz
Line 22: Line 21:
  
 
'''To Do'''
 
'''To Do'''
:We will learn at separators if we need to add a phase delay
+
:We will learn at separators if we can flip A/D or D/A order
 
:We will decide by summer time a final system configuration
 
:We will decide by summer time a final system configuration
  
:RTI testing
+
==GTS==
 +
'''SF6'''
 +
:Bubba repaired leak, pumping now and check

Revision as of 11:16, 11 February 2015

Startup Tasks

Laser Program

A = 50uA @ 125 MHz or 100uA @ 250 MHz
B = 499
C = 250

Laser setup

No spare amps, 4-6 weeks from IPG for two replacement amps
Replace 2m (FWHM~1mm) spot lens with 1.5m (FWHM~0.4mm) lens

Phase flip

Make divider box less sensitive to EMI?
Phase monitoring to keep phases between 3 lasers
Analog gain switching at 250 MHz

Change the laser phase

When we change the frequency use 0I04 viewer to check/set phase
Command line EPICS control sufficient now, Mike Johnson still working it
Tomas can provide a ~2ns delay cable
John can DAC control a phase delay ~2ns

To Do

We will learn at separators if we can flip A/D or D/A order
We will decide by summer time a final system configuration

GTS

SF6

Bubba repaired leak, pumping now and check