February 14, 2019 - Weekly ME Meeting
Jump to navigation
Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
Today's Agenda
- Gun Region
- Modify anode with SHV feedthru : (MDC: SHV-10 Coaxial Feedthrough, 1 Pin, Recessed, Gounded Shield
- Signed
- Booster Region
- latest layout of chopper to 1/4 module media:LAYOUT14FEB19.pdf
- old 1/4 module interface drawing media:11100-0008 REV F 1-3.pdf
- new booster drawing media:CRM1107001-0001_-_PDF_1.pdf
- Danny updated Reza's concept with corrected dimensions media:Injector upgrade Choppers to Booster v01DM.pptx
From Last Week's Agenda
- Gun Region
- Gun electrode assembly drawing w/ revised small mushroom for CEBAF media:ACC2003000-0310 REV A SHT 1.pdf media:ACC2003000-0310 REV A SHT 2.pdf
- Booster Region
- Danny's present as-is layout chopper to module media:190207_chopper2module.pdf
- Reza's present concept chopper to booster media:Injector upgrade Choppers to Booster v01.pptx
From Prior Agendas
- Gun Region
- Recent upgrade layout from 1/24/19 media:190123_gun_to_chopper.pdf
- Slides from 1/24/19 media:190123_INJ.pptx (material on slide#4 is new)