Difference between revisions of "February 22, 2021 - I&C Installation Kickoff"

From Ciswikidb
Jump to navigation Jump to search
 
(23 intermediate revisions by the same user not shown)
Line 9: Line 9:
 
; Installation status
 
; Installation status
 
* Schedule
 
* Schedule
* Updated songsheet
+
**Transition from vac/mech to girder hook-ups planned to begin April 5 (6 weeks from today)
* [[Phase 1 - HCO & Commissioning]]
+
**We may be ready early by 1 or 2 weeks (no sooner than mid-March)
; Software
+
**Total of 4 weeks are allocated for girder hook-ups (Apr 5 - Apr 30)
* CED
+
**Goal is HCO/System readiness for everything up to FC#2
* Apps
+
 
* Screens
+
*Preliminary Songsheet
 +
** Most recent posted on Friday Feb 18
 +
** Search Layout area on the upgrade home page => [[CEBAF Injector Upgrade]]
 +
 
 
; I&C Jobs
 
; I&C Jobs
 +
* What to expect in tunnel?
 +
** Similar mechanical layout => Gun + 3 girders (Y + Wien + A1/A2)
 +
** There is now a 3D CAD model from gun to chopper, I can share pics or see Gary Hays or Shaun Gregory
 +
** Similar utilities => LCW (A1/A2) + Air (Bubba/Phil) + Cable trays (above & on girder) + 3 cable bundle drops (Y, Laser, Chopper)
 +
 +
* BPMs
 +
** 10 total - all unrotated
 +
** 3 new style => NEG coated large bore (2.5" ID); mapped by Musson (Kx/Ky values available)
 +
** 7 old style => 5.5" long end tapped
 +
 
* Viewers
 
* Viewers
* BPMs
+
** 8 total  - all chromox except ITV0I02 (YAG)
 +
** Crash inhibit #1 : ITV0I01 and Polarized Cup IFY0I01
 +
** Crash inhibit #2 : ITV0I02 and Harp IHA0I02
 +
 
 
* Harps
 
* Harps
 +
** 1 total - IHA0I02 (YAG), on same cross as viewer ITV0I02 (requires crash inhibit)
 +
 +
* Wien HV
 +
** Tony status update
 +
 
* Current Monitoring
 
* Current Monitoring
 +
** 3 total - same as before (PCUP, A1, A2)
 +
** PCUP identical as before, just a new location
 +
** A1 current monitoring as before, linear bellow motion now has STAC5 motor (so remote or manual; has 3 stop positions
 +
** A2 current monitoring as before, linear bellows manual as before; has 3 stop positions.  Used by PSS group for kicker
 +
 
* Valves
 
* Valves
 +
** 3 total - all have in-line EPICS shut over ride capability (CIS installs this box)
 +
** Gun valve - VBV2I01A (new name), otherwise same all metal gate valve
 +
** Beam line valve - VBV1I07 (same name), same all metal gate valve
 +
** Beam line valve - VBV0I02 (same name), but now all metal gate valve, requires cable terminations like VBV1I07
 +
** All 3 valves tied to UHV vacuum fault (100 uA limit)
 +
 
* Ion pumps
 
* Ion pumps
* Wien HV
+
** Marcy's final list [[media:210209_ion pump names.xlsx]]
 +
 
 +
; Software Jobs
 +
* CED
 +
** Michele or Gary can gives us an update
 +
 
 +
* Apps
 +
** Injector steering script getting upgrades for Wien/Solenoid controls, also needs update of correctors/bpms
 +
** Any script that refers to CED elements from Gun to Chopper will need name review, sounds like a big job
 +
 
 +
* Screens
 +
** I guess many screens auto-updated from CED, that's great
 +
** Like with apps, will need name review; I guess system owners look at their own screens for oddities?
 +
 
 +
* What else for software?
 +
 
 
; CIS Jobs
 
; CIS Jobs
 +
* Let's quickly scan CIS jobs, see if we missed anything [[Phase 1 - HCO & Commissioning]]
 +
 
; Plans
 
; Plans
 +
* Jobs list => Phase 1 area on the upgrade home page => [[CEBAF Injector Upgrade]]
 +
* Will meet with Magnets, DC Power, Software next Monday Mar 4, you're welcome to join
 +
* When should WE meet again and leading up to April 5?
 +
* Then 8am and Toolbox meetings at 8:30
 +
* Tally ho!

Latest revision as of 12:33, 22 February 2021

Meeting Info =

We will meet Monday February 22 @ 1:30 pm via BlueJeans
Meeting URL (for video and/or audio call in): https://bluejeans.com/7572697097
Phone number (for audio call in): 1-888-240-2560
Meeting ID: 7572697097#

Agenda

Installation status
  • Schedule
    • Transition from vac/mech to girder hook-ups planned to begin April 5 (6 weeks from today)
    • We may be ready early by 1 or 2 weeks (no sooner than mid-March)
    • Total of 4 weeks are allocated for girder hook-ups (Apr 5 - Apr 30)
    • Goal is HCO/System readiness for everything up to FC#2
  • Preliminary Songsheet
I&C Jobs
  • What to expect in tunnel?
    • Similar mechanical layout => Gun + 3 girders (Y + Wien + A1/A2)
    • There is now a 3D CAD model from gun to chopper, I can share pics or see Gary Hays or Shaun Gregory
    • Similar utilities => LCW (A1/A2) + Air (Bubba/Phil) + Cable trays (above & on girder) + 3 cable bundle drops (Y, Laser, Chopper)
  • BPMs
    • 10 total - all unrotated
    • 3 new style => NEG coated large bore (2.5" ID); mapped by Musson (Kx/Ky values available)
    • 7 old style => 5.5" long end tapped
  • Viewers
    • 8 total - all chromox except ITV0I02 (YAG)
    • Crash inhibit #1 : ITV0I01 and Polarized Cup IFY0I01
    • Crash inhibit #2 : ITV0I02 and Harp IHA0I02
  • Harps
    • 1 total - IHA0I02 (YAG), on same cross as viewer ITV0I02 (requires crash inhibit)
  • Wien HV
    • Tony status update
  • Current Monitoring
    • 3 total - same as before (PCUP, A1, A2)
    • PCUP identical as before, just a new location
    • A1 current monitoring as before, linear bellow motion now has STAC5 motor (so remote or manual; has 3 stop positions
    • A2 current monitoring as before, linear bellows manual as before; has 3 stop positions. Used by PSS group for kicker
  • Valves
    • 3 total - all have in-line EPICS shut over ride capability (CIS installs this box)
    • Gun valve - VBV2I01A (new name), otherwise same all metal gate valve
    • Beam line valve - VBV1I07 (same name), same all metal gate valve
    • Beam line valve - VBV0I02 (same name), but now all metal gate valve, requires cable terminations like VBV1I07
    • All 3 valves tied to UHV vacuum fault (100 uA limit)
Software Jobs
  • CED
    • Michele or Gary can gives us an update
  • Apps
    • Injector steering script getting upgrades for Wien/Solenoid controls, also needs update of correctors/bpms
    • Any script that refers to CED elements from Gun to Chopper will need name review, sounds like a big job
  • Screens
    • I guess many screens auto-updated from CED, that's great
    • Like with apps, will need name review; I guess system owners look at their own screens for oddities?
  • What else for software?
CIS Jobs
Plans
  • Jobs list => Phase 1 area on the upgrade home page => CEBAF Injector Upgrade
  • Will meet with Magnets, DC Power, Software next Monday Mar 4, you're welcome to join
  • When should WE meet again and leading up to April 5?
  • Then 8am and Toolbox meetings at 8:30
  • Tally ho!