Difference between revisions of "February 6, 2020 - Mechanical engineering"

From Ciswikidb
Jump to navigation Jump to search
Line 7: Line 7:
 
* Do we modify how the MS/CP are inserted/retracted (do we still need a CP?)
 
* Do we modify how the MS/CP are inserted/retracted (do we still need a CP?)
 
* Replace existing pump with 45 L/sec pump, w/ well located pump out port
 
* Replace existing pump with 45 L/sec pump, w/ well located pump out port
 +
* Shaun drawings...
 +
::[[media::JL0091770 SOLENOID COMPARISONS LEGACY & MFY.pdf]]
 +
::[[media::39200-0033 INJECTOR MODIFICATIONS CHOPPER ASSEMBLY REV- SH1.pdf]]
  
 
==ME Layout Agenda==
 
==ME Layout Agenda==

Revision as of 16:14, 5 February 2020

We'll meet at 9am TL-2236 for chopping chamber, then transition into weekly ME meeting

Chopping Chamber Agenda

  • Incorporates new FY 92mm ID solenoids
  • Uses improved linear manipulators for the A, B, C slits
  • Do we replace chromox screen with a YAG screen, with markings or fiducials?
  • Do we modify how the MS/CP are inserted/retracted (do we still need a CP?)
  • Replace existing pump with 45 L/sec pump, w/ well located pump out port
  • Shaun drawings...
[[media::JL0091770 SOLENOID COMPARISONS LEGACY & MFY.pdf]]
[[media::39200-0033 INJECTOR MODIFICATIONS CHOPPER ASSEMBLY REV- SH1.pdf]]

ME Layout Agenda

Quick links