Difference between revisions of "February 6, 2020 - Mechanical engineering"
Jump to navigation
Jump to search
Line 3: | Line 3: | ||
==Chopping Chamber Agenda== | ==Chopping Chamber Agenda== | ||
* Incorporates new FY 92mm ID solenoids | * Incorporates new FY 92mm ID solenoids | ||
+ | ::GPT model puts FY solenoids at Jay's TN center lines -/+ 9.8425 cm, should/can they be different? | ||
+ | ::What sort of tolerances should be included in simulations? | ||
* Uses improved [https://www.lesker.com/newweb/sample_manipulation/linearshifts_lsm-hlsm.cfm linear manipulators] for the A, B, C slits | * Uses improved [https://www.lesker.com/newweb/sample_manipulation/linearshifts_lsm-hlsm.cfm linear manipulators] for the A, B, C slits | ||
* Do we replace chromox screen with a YAG screen, with markings or fiducials? | * Do we replace chromox screen with a YAG screen, with markings or fiducials? |
Revision as of 16:18, 5 February 2020
We'll meet at 9am TL-2236 for chopping chamber, then transition into weekly ME meeting
Chopping Chamber Agenda
- Incorporates new FY 92mm ID solenoids
- GPT model puts FY solenoids at Jay's TN center lines -/+ 9.8425 cm, should/can they be different?
- What sort of tolerances should be included in simulations?
- Uses improved linear manipulators for the A, B, C slits
- Do we replace chromox screen with a YAG screen, with markings or fiducials?
- Do we modify how the MS/CP are inserted/retracted (do we still need a CP?)
- Replace existing pump with 45 L/sec pump, w/ well located pump out port
- Shaun drawings...
ME Layout Agenda
- Feb 04, 2020 media:BEAMLINELAYOUTFEB04.pdf edits post modellers meeting (add bpm/cor after Y, and swap bpm/corr by A1
- Jan 31, 2020 media:200203_layout.pdf major revision to address setting up the beam line
- First viewer design media:YagViewerHole.pdf
- BPM overview Short media:shortBPM.pdf and Long media:7-52BPM.pdf UITF viewers