Difference between revisions of "February 7, 2019 - Weekly ME Meeting"

From Ciswikidb
Jump to navigation Jump to search
Line 1: Line 1:
 
===Today's Agenda===
 
===Today's Agenda===
 +
; Gun Region
 +
: Gun electrode assembly drawing w/ revised small mushroom for CEBAF [[media:ACC2003000-0310 REV A SHT 1.pdf]] [[media:ACC2003000-0310 REV A SHT 2.pdf]]
  
 
; Booster Region
 
; Booster Region
Line 10: Line 12:
 
: Recent upgrade layout from 1/24/19 [[media:190123_gun_to_chopper.pdf]]
 
: Recent upgrade layout from 1/24/19 [[media:190123_gun_to_chopper.pdf]]
 
: Slides from 1/24/19 [[media:190123_INJ.pptx]] ('''material on slide#4 is new''')
 
: Slides from 1/24/19 [[media:190123_INJ.pptx]] ('''material on slide#4 is new''')
 
==== Gun2 electrode parts discussion [[media:190131_Gun2Electrode.pdf]] ====
 
Attached is the initial electrode assembly drawing. i will update it and get info together to order
 
parts. some parts have been revised since this drawing. i would also like to show the correct electrode
 
(which i presume to be the T-shaped with the small mushroom). which insulator is used? i presume
 
that one of the new top flanges we just ordered will be the top flange?
 
thanks.
 

Revision as of 18:27, 6 February 2019

Today's Agenda

Gun Region
Gun electrode assembly drawing w/ revised small mushroom for CEBAF media:ACC2003000-0310 REV A SHT 1.pdf media:ACC2003000-0310 REV A SHT 2.pdf
Booster Region
Danny's present as-is layout chopper to module media:190207_chopper2module.pdf
Reza's present concept chopper to booster

From Prior Agendas

Gun Region
Recent upgrade layout from 1/24/19 media:190123_gun_to_chopper.pdf
Slides from 1/24/19 media:190123_INJ.pptx (material on slide#4 is new)