(Created page with "'''Limit voltage to 135kV''' == (1) Status == * Gun assembled with ceramic and blank flange only. Pumping. 4e-8 over 3 days (potential leak) * RF cage complete * Back plate...")
 
(Replaced content with "* Vacuum leak * PSS trip at 115 kV")
Line 1: Line 1:
'''Limit voltage to 135kV'''
+
* Vacuum leak
  
== (1) Status ==
+
* PSS trip at 115 kV
 
+
* Gun assembled with ceramic and blank flange only. Pumping. 4e-8 over 3 days (potential leak)
+
* RF cage complete
+
* Back plate modified and hot deck attached in 'run set-up' (new bar placement an issue - might want to recess the bar)
+
* Electrode assembled and snow cleaned ready for installation
+
* GTS cleaner
+
 
+
== (2) Plans ==
+
* PSS cert
+
* Run up Xelera spellman connected to gun to 135kV
+
* If corona test good... break vacuum and install electrodes
+
* Leak check, Quick HV test, then bake, Kr processing as necessary
+
 
+
To Fix List (to get GTS running):
+
 
+
* Glassman PSS Chassis (Service request to Omar - Carlos)
+
* LCW Chassis (Coleman today or tomorrow)
+
* Spellman (needs further investigation)
+
* Picoammeter x2? (Pete Francis in hand - sent for fix)
+
* Viewers insertion boxes bad
+
 
+
To Check:
+
 
+
* Magnets (IOC check)
+
* Cathode solenoid - power supply
+
 
+
== (3) T-Gun Upgrades ==
+
 
+
To Fix/Modify:
+
* DC bias supply - set point fix (John Musson)
+
* Software issues (Karl to contact Spellman again)
+
* Install new fiber link & check (CW setting - Mark emailed company)
+
* Need RF fiber from Karl for reflected power
+
 
+
== (4) Housekeeping==
+
 
+
* Remove JLab spellman
+
* Sort out the air and nitrogen lines.
+