GTS meeting 10 16 17

From Ciswikidb
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
  • Shutdown Plan:
  1. Install new YAG screen at viewer 3
  2. Fix existing harp and install 20 µm tungsten wire
  3. Add a new CEBAF-style harp with 10 µm tungsten wire (i.e, GTS will have two harps)
  4. Fix leaky vent valve
  5. Activate new photocathode (new puck) with full active area


  • Map RadiaBeam steerer and measure the electrical characteristics (e.g., time constant)


  • Next Shutdown – January 2018:
  1. Install TE011 cavity


  • High current runs: [1]