GTS meeting 11 03 15

From Ciswikidb
Revision as of 14:48, 3 November 2015 by Chgarcia (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
  • Puck # 4 has been installed using the long manipulator. Phil had to adpat the long "schneedle" to make up the length.
  • The puck was cycled in and out several times successfully. We left the puck inserted in the electrode for high voltage conditioning, and retracted the manipulator into the prep chamber.
  • Sheep chamber has one GP100, two viewports, one 20 l/s ion pump with valve and several viewports. The rest is blanked off for gun chamber bake
  • The anode flange has been installed with electrical feedthrough connected to the isolated anode. Checked open OK. Three viewports have been mounted. A green laser beam has been aimed at the cathode and checked that it exits correctly.
  • Bubba and Phil installed the anode gate valve, with a viewport on one side.
  • The system is pumping down and Phil and Bubba installed a heating jacket to warm up the NEG strips mounted on the bottom of the chamber.
  • Sheep chamber sketch for figuring out the heaters length Media:Sheep chamber sketch for heaters length.pdf
  • Gun and sheep chamber 02.jpg
  • Gun and sheep chamber side view.jpg
  • Sheep chamber ready for vacuum.jpg
  • Gun and sheep chamber back end view.jpg
  • Viewports and valve.jpg
  • Looking down the valve.jpg
  • Looking at the cathode from top viewport.jpg
  • The cathode with Green Laser Light.jpg
  • Getting toasty 02.jpg
  • Under rough vacuum.jpg