Difference between revisions of "GTS meeting 11 08 16"

From Ciswikidb
Jump to navigation Jump to search
Line 5: Line 5:
  
  
* Magnets:
+
* New Beamline Magnets:
# Two more solenoids (2 Amps) and five new radiabeam steerers (3 Amps)
+
# Add two more solenoids (2 Amps) and five new radiabeam steerers (3 Amps) – power cables (12 in total)
# Power cables (12 in total)
+
 
# Radiabeam Steerer's mounts
+
 
 +
* Procurement:
 +
# Two radiabeam steerers
 +
# Steerers mounts

Revision as of 09:29, 8 November 2016

  • EES support at GTS:
  1. SCAM module installation
  2. Upgrade diagnostic crossings with 3-position controls (viewer, slit, empty)
  3. Instrument Faraday Cup


  • New Beamline Magnets:
  1. Add two more solenoids (2 Amps) and five new radiabeam steerers (3 Amps) – power cables (12 in total)


  • Procurement:
  1. Two radiabeam steerers
  2. Steerers mounts