Difference between revisions of "GTS meeting 11 08 16"

From Ciswikidb
Jump to navigation Jump to search
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
* EES support at GTS:
+
* Beamline Drawings:
# SCAM module installation
+
:[[file:GTS_Beamline_11-8-16_Front_View.jpg]]
# Upgrade diagnostic crossings with 3-position controls (viewer, slit, empty)
+
 
# Instrument Faraday Cup
+
 
 +
:[[media:haysg_JL0038343-MAGNETIZED_BEAM_LDRD_ASSY.pdf]]
  
  
 
* New Beamline Magnets:
 
* New Beamline Magnets:
 
# Add two more solenoids (2 Amps) and five new radiabeam steerers (3 Amps) – power cables (12 in total)
 
# Add two more solenoids (2 Amps) and five new radiabeam steerers (3 Amps) – power cables (12 in total)
 +
 +
 +
* EES support at GTS:
 +
# SCAM module installation
 +
# Upgrade the two diagnostic crossings with 3-position controls (viewer, slit, empty)
 +
# Instrument Faraday Cup
  
  
Line 12: Line 19:
 
# Two radiabeam steerers
 
# Two radiabeam steerers
 
# Steerers mounts
 
# Steerers mounts
 +
# What else?

Latest revision as of 17:08, 15 November 2016

  • Beamline Drawings:
GTS Beamline 11-8-16 Front View.jpg


media:haysg_JL0038343-MAGNETIZED_BEAM_LDRD_ASSY.pdf


  • New Beamline Magnets:
  1. Add two more solenoids (2 Amps) and five new radiabeam steerers (3 Amps) – power cables (12 in total)


  • EES support at GTS:
  1. SCAM module installation
  2. Upgrade the two diagnostic crossings with 3-position controls (viewer, slit, empty)
  3. Instrument Faraday Cup


  • Procurement:
  1. Two radiabeam steerers
  2. Steerers mounts
  3. What else?