GTS meeting 11 08 16

From Ciswikidb
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
  • Beamline Drawings:
GTS Beamline 11-8-16 Front View.jpg


media:haysg_JL0038343-MAGNETIZED_BEAM_LDRD_ASSY.pdf


  • New Beamline Magnets:
  1. Add two more solenoids (2 Amps) and five new radiabeam steerers (3 Amps) – power cables (12 in total)


  • EES support at GTS:
  1. SCAM module installation
  2. Upgrade the two diagnostic crossings with 3-position controls (viewer, slit, empty)
  3. Instrument Faraday Cup


  • Procurement:
  1. Two radiabeam steerers
  2. Steerers mounts
  3. What else?