Difference between revisions of "GTS meeting 1 07 19"

From Ciswikidb
Jump to navigation Jump to search
Line 12: Line 12:
 
# Move DP can 1 to end of beamline
 
# Move DP can 1 to end of beamline
 
# All bellows at least 2.5 inch diameter
 
# All bellows at least 2.5 inch diameter
 +
# Both gate valves are 2.5 inch-bore and will remain on beamline
 +
 +
 +
* Remove gain-switched laser from GTS to LERF
  
  

Revision as of 13:19, 7 January 2019

  • List of beamline hardware modifications:
  1. Replace YAG screen on Viewer 1
  2. Replace Slit on Viewer 2 with holes assembly
  3. Replace two ion collectors with new ones
  4. Replace Harp fork (Tony)
  5. Remove modified DP can
  6. Remove Faraday Cup
  7. Remove bellow upstream of dump
  8. Install TE011 Cavity
  9. Install Deflecting Cavity
  10. Install new 5th solenoid
  11. Move DP can 1 to end of beamline
  12. All bellows at least 2.5 inch diameter
  13. Both gate valves are 2.5 inch-bore and will remain on beamline


  • Remove gain-switched laser from GTS to LERF


  • List of software and controls changes:
  1. Re-program SCAM to allow for 1 Hz and 50 ns macro-pulses
  2. Add 5th solenoid to magnet screen