Difference between revisions of "GTS meeting 1 14 19"

From Ciswikidb
Jump to navigation Jump to search
 
(9 intermediate revisions by the same user not shown)
Line 1: Line 1:
* List of beamline hardware modifications:
+
= '''List of beamline hardware modifications''' =
 
# Replace YAG screen on Viewer 1 - '''''Done'''''
 
# Replace YAG screen on Viewer 1 - '''''Done'''''
 
# Replace Slit on Viewer 2 with holes assembly - '''''Done'''''
 
# Replace Slit on Viewer 2 with holes assembly - '''''Done'''''
Line 9: Line 9:
 
# Remove LDR Harp arm and replace with ion-pump
 
# Remove LDR Harp arm and replace with ion-pump
 
# Install TE011 Cavity
 
# Install TE011 Cavity
# Install Deflecting Cavity
+
# Install Deflecting Cavity - '''''Done'''''
 
# Install new 5th solenoid
 
# Install new 5th solenoid
# Move DP can 1 to end of beamline
+
# Move DP can 1 to end of beamline - '''''Done'''''
# All bellows at least 2.5 inch diameter
+
# All bellows at least 2.5 inch diameter - '''''Done'''''
 
# Both gate valves are 2.5 inch-bore and will remain on beamline - '''''Done'''''
 
# Both gate valves are 2.5 inch-bore and will remain on beamline - '''''Done'''''
  
  
* List of hardware support:
+
= '''List of hardware support''' =
# Deflecting Cavity power supply, MO and other parts
+
# Install Deflecting Cavity power supply, MO and other parts
# TE011 Cavity readout cable and electronics
+
# Install TE011 Cavity readout cable and electronics
  
  
* List of software and controls changes:
+
= ''' List of software and controls changes''' =
 
# Re-program SCAM to allow for 1 Hz and 50 ns macro-pulses
 
# Re-program SCAM to allow for 1 Hz and 50 ns macro-pulses
 
# Add 5th solenoid to magnet screen
 
# Add 5th solenoid to magnet screen
  
  
* Modification to HV and Preparation chambers:
+
= ''' Remove gain-switched laser from GTS to Lab 6''' =
 +
 
 +
 
 +
= ''' Install Brock's Magnetometer Cavity''' =
 +
 
 +
 
 +
= ''' Modification to HV and Preparation chambers''' =
 
# Upgrade anode HV bias feed-through to 5 kV
 
# Upgrade anode HV bias feed-through to 5 kV
 
# Remove anode and clean melted spot
 
# Remove anode and clean melted spot
 
# Fix Transverse Manipulator
 
# Fix Transverse Manipulator
 
# Fix Sb boat
 
# Fix Sb boat
# Clean chamber of Sb pellets
+
# Clean Sb pellets off chamber
 
 
 
 
* Remove gain-switched laser from GTS to LERF
 
 
 
 
 
* Install BNL high bunch laser
 
  
  
* Install Brock's TE011 Cavity
+
= ''' Install BNL high bunch laser''' =

Latest revision as of 10:14, 28 January 2019

List of beamline hardware modifications

  1. Replace YAG screen on Viewer 1 - Done
  2. Replace Slit on Viewer 2 with holes assembly - Done
  3. Replace two ion collectors with new ones
  4. Replace Harp fork (Tony)
  5. Remove modified DP can - Done
  6. Remove Faraday Cup - Done
  7. Remove bellow upstream of dump - Done
  8. Remove LDR Harp arm and replace with ion-pump
  9. Install TE011 Cavity
  10. Install Deflecting Cavity - Done
  11. Install new 5th solenoid
  12. Move DP can 1 to end of beamline - Done
  13. All bellows at least 2.5 inch diameter - Done
  14. Both gate valves are 2.5 inch-bore and will remain on beamline - Done


List of hardware support

  1. Install Deflecting Cavity power supply, MO and other parts
  2. Install TE011 Cavity readout cable and electronics


List of software and controls changes

  1. Re-program SCAM to allow for 1 Hz and 50 ns macro-pulses
  2. Add 5th solenoid to magnet screen


Remove gain-switched laser from GTS to Lab 6

Install Brock's Magnetometer Cavity

Modification to HV and Preparation chambers

  1. Upgrade anode HV bias feed-through to 5 kV
  2. Remove anode and clean melted spot
  3. Fix Transverse Manipulator
  4. Fix Sb boat
  5. Clean Sb pellets off chamber


Install BNL high bunch laser