Difference between revisions of "GTS meeting 1 14 19"

From Ciswikidb
Jump to navigation Jump to search
Line 18: Line 18:
 
* List of hardware support:
 
* List of hardware support:
 
# Deflecting Cavity power supply, MO and other parts
 
# Deflecting Cavity power supply, MO and other parts
# TE011 Cavity readout cables and electronics
+
# TE011 Cavity readout cable and electronics
  
  

Revision as of 10:35, 15 January 2019

  • List of beamline hardware modifications:
  1. Replace YAG screen on Viewer 1 - Done
  2. Replace Slit on Viewer 2 with holes assembly - Done
  3. Replace two ion collectors with new ones
  4. Replace Harp fork (Tony)
  5. Remove modified DP can - Done
  6. Remove Faraday Cup - Done
  7. Remove bellow upstream of dump - Done
  8. Remove LDR Harp arm and replace with ion-pump
  9. Install TE011 Cavity
  10. Install Deflecting Cavity
  11. Install new 5th solenoid
  12. Move DP can 1 to end of beamline
  13. All bellows at least 2.5 inch diameter
  14. Both gate valves are 2.5 inch-bore and will remain on beamline - Done


  • List of hardware support:
  1. Deflecting Cavity power supply, MO and other parts
  2. TE011 Cavity readout cable and electronics


  • List of software and controls changes:
  1. Re-program SCAM to allow for 1 Hz and 50 ns macro-pulses
  2. Add 5th solenoid to magnet screen


  • Modification to HV and Preparation chambers:
  1. Upgrade anode HV bias feed-through to 5 kV
  2. Remove anode and clean melted spot
  3. Fix Transverse Manipulator
  4. Fix Sb boat
  5. Clean chamber of Sb pellets


  • Remove gain-switched laser from GTS to LERF