Difference between revisions of "GTS meeting 2 02 21"
Jump to navigation
Jump to search
Line 9: | Line 9: | ||
− | * Prep Chamber: (Mamun) | + | * Prep Chamber: (Mamun)- Completed [https://logbooks.jlab.org/entry/3869663] |
** Fix Transverse Manipulator | ** Fix Transverse Manipulator | ||
** Fix Sb boat | ** Fix Sb boat |
Revision as of 08:39, 14 March 2021
- Upgrade Glassman Gun PSS interlock chassis (Carlos)
- Add vacuum interlock to HV supply (Scott)
- Beamline - no bake of beamline: (Mamun and Bubba)
- Replace YAG screens on Viewers 1,2 and 3
- Replace leaky right-angle valve
- Remove Deflecting Cavity and move TE_011 Cavity in its place
- Prep Chamber: (Mamun)- Completed [1]
- Fix Transverse Manipulator
- Fix Sb boat
- Clean Sb pellets off chamber
- Clean/check Bottom Heater
- Add Cs for Robust Photocathode research
- Clean/replace windows
- Add pucks with Nb and GaAs (Robust Photocathode) substrates
- Gun HV Chamber: (Carlos)
- Clean anode, cathode front
- Replace Anode
- Replace Pierce geometry
- Upgrade anode HV bias feed-through to 5/10 (?) kV
- Laser: (Shukui)
- Re-install 500 MHz green fiber laser
- Install new pulse laser